52, St. Stephen's Green, Dublin 2, D02 DR67
Conservation and restoration works to a Georgian building on St. Stephen's Green.
4225/24 · Dublin City Council · Lodged 14 August 2024
- Reference
- 4225/24
- Authority
- Dublin City Council
- Register status
- In progress
- Type
- State Authority Works
- Received
- 14 August 2024
Summary
AI-generatedThe development consists of extensive conservation and restoration works to a 1,548 square metre Georgian building. Works include brick repair, window sash restoration, roof re-slating, and interior structural stabilization of timber floors.
- Floor area
- 1,548 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Saw: protected structure: in accordance with the provisions of part 9 of s. I. No. 600/2001, planning and development regulations 2001 (as amended), give notice of their intention to carry out the following development at: 52 st. Stephen's green, dublin, d02 dr67. The development will consist of conservation and restoration works to the georgian building (1,548m2) only, a protected structure (ref. No. 7785), consisting of: (a) works to the front facade onto st. Stephen's green and to the rear overlooking the 1970's extension/office block, including brick repair and wigged repointing in lime mortars, restoration of reveals, cleaning and restoration of the limestone front door surround, minor repairs and painting of ironwork to railings and cleaning and repairs to granite plinth and steps; (b) restoration of historic window sashes and frames window retaining all historic glass (single-glazing); (c) restoration of roofs including recovery of slate roof and re-slating in blue bangor; (d) non-invasive alterations to existing interiors including strengthening of suspended timber floors on 1st, 2nd and 3rd floors; (e) conservation and stabilisation of historic lath and plaster ceilings to ground floor; (f) upgrade to existing service installations throughout; (g) redecoration following historic paint analysis. An appropriate assessment (aa) screening was undertaken for the proposed development. It concluded that there will be no likely significant effects on any natura 2000 sites, either alone or in combination with any other plans or projects. An environmental impact assessment (eia) preliminary examination was undertaken for the proposed development. It concluded that, based on a preliminary examination of all environmental receptors and criteria set out in schedule 7 of the planning and development regulations 2001 (as amended), an eiar is not recommended under the category of sub-threshold development. Any person may, within 4 weeks from the date of the notice, apply to an bord pleanala for a screening determination as to whether the development would be likely to have a significant effects on the environment. The abovementioned eia and aa screenings may be inspected online at the following website: https://www. Gov. Ie/en/consultations. Drawings and particulars of the proposed development will be available for inspection by appointment only and with two working days' notice, between 9.30am and 12.30pm and between 2.30pm and 5.00pm, monday to friday for a period of 6 weeks beginning on the date of the publication of this notice at: the office of public works, 1gq, georges quay, dublin 2, d02 y098. All appointments for viewing should be sent to: 52ssgplanning@opw. Ie or tel: (046) 942 2000. Submissions and/or observations on the proposed development, dealing with the proper planning and development of the area, may be made in writing within a period of 6 weeks beginning on the date of the publication of this notice to: the commissioners of public works in ireland, the office of public works, major projects, 1gq, georges quay, dublin d02 y098.
Key dates
Timeline
- Application received14 August 2024
- Decision due25 September 2024
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionInfrastructure
SAW: PROTECTED STRUCTURE: The development will consist of the replacement of existing non historic perimeter…
Rear of 52 St. Stephen's Green at 6 Ely Place Upper, Dublin, 2
3494/25Dublin CityLodged 17 Dec 2025
- GrantedDemolition
PROTECTED STRUCTURE : Planning permission for development at Stephen Court, 18-21 St. Stephen's Green, Dublin…
Stephen Court, 18-21, Saint Stephen's Green, Dublin 2, D02 N960
4055/22Dublin CityLodged 24 May 2022
- Awaiting decisionChange of use
SAW: PROTECTED STRUCTURE: In accordance with the provisions of Part 9 of S.I. No. 600 of 2001: Local…
Printworks, Stamping Building, Dublin Castle, Dublin 2
3051/25Dublin CityLodged 11 Feb 2025
- GrantedCommercial
PROTECTED STRUCTURE : Permission for development at a c. 0.126 ha site at nos. 92 and 93 St. Stephen's Green…
92 and 93 St. Stephen's Green, Dublin 2
3965/24Dublin CityLodged 5 Jul 2024
- GrantedAlterations
PROTECTED STRUCTURE: Permission for general repair and refurbishment works to facades, to both St. Stephens…
13, Saint Stephen's Green North / 24 Dawson Street, Dublin 2
2255/18Dublin CityLodged 7 Feb 2018
- GrantedCommercial
PROTECTED STRUCTURE: The development will consist of the following: a) Refurbishment of the Protected…
Lands at 16, Saint Stephen's Green (a Protected Structure) and linked modern office building to the rear bounded by Joshua Lane, Dublin 2
2060/18Dublin CityLodged 12 Jan 2018
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.