Planning Permission Ireland
GrantedExtensionDecided 25 November 2024

24, Oaklands Drive, Dublin 6

Raising the roof height, installing Velux windows, incorporating an external overhang, and adding a front bay window.

4316/24 · Dublin City Council · Lodged 1 October 2024

Reference
4316/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
1 October 2024

Summary

AI-generated

The development involves removing part of the existing roof to construct a new roof, increasing the wall plate and ridge height by 1.2 metres. It also includes incorporating an external overhang into the living area, adding a front bay window, and applying external insulation.

Extensionroof extensioninsulationbay window
Floor area
10 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission at 24 oaklands drive, rathgar, dublin 6, d06 xof5. The development will consist of the part removal of the existing roof to the front of the house and construction of a new roof with 3no. Velux windows and an increase in wall plate and ridge height of 1.2 m over the existing dwelling house. Construction also includes the incorporation of the existing external overhang into the living area (7.2sqm), a 3sqm bay window to the front and the external insulating of the existing property with all appropriate site works required for this development.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 May 2025.

Notified floor area: 212

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
23 Oak Apple Green, Rathgar, Dublin 6Jul 2025€250,00054 m
34 Highfield Court, Highfield Rd, Rathgar Dublin 6Dec 2025€310,00061 m
25 Oak Apple Green, Rathgar, Dublin 6Oct 2025€527,50066 m
4 Oak Apple Green, Rathgar, Dublin 6Aug 2025€580,00067 m
7 Oak Apple Green, Rathgar, Dublin 6Jun 2025€650,00074 m
45 Grove Park, Rathmines, Dublin 6Aug 2025€1,250,00074 m
32 Oak Apple Green, Rathgar, Dublin 6Mar 2026€430,00078 m
12 Hillcourt, Highfield Rd, Rathgar Dublin 6Jan 2025€299,000105 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 October 2024
  2. Decision due25 November 2024
  3. Decision issued25 November 2024
  4. Permission expiry6 March 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.