Planning Permission Ireland
InvalidIndustrialDecided 4 July 2022

Diageo Brewery, bounded by James's Street, Watling Street, Victoria Quay and Steven's Lane, Dublin 8

Construction of a new Nitrogen Generation Plant at the Diageo Brewery in Dublin 8.

4322/22 · Dublin City Council · Lodged 27 June 2022

Reference
4322/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
27 June 2022

Summary

AI-generated

The development involves removing an existing fence to construct a Nitrogen Generation Plant to produce nitrogen enriched gas for beer production. The plant will feature a 26-metre-high cold box tower, two 21-metre-high storage tanks, and associated machinery.

Industrialbreweryindustrialnitrogen

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The description of development is as follows: -removal of existing fence through the site and development of a nitrogen generation plant to produce nitrogen enriched gas for use in the production of beer at a site located centrally within the brewery site. The development will include a lattice style cold box instillation tower to a height of c. 26 m, 2 no. Cylindrical storage tanks to a height of c. 21m and plant and machinery for the production of nitrogen including a cold box vaporiser installation, a warm end installation, a lin pump cold box installation, an expander module, cold valves, ambient vaporisers, final control skid and all other associated works. -a new fence around the proposed plant is also proposed. The proposal is located within a site which has an approved ie (industrial emissions) licence (ref. No. P0301-04).

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
49 Steevens Gate, James St, Dublin 8Apr 2025€435,000153 m
Apt 38 Steevens Gate, 126 - 133 James Street, Dublin 8Feb 2025€545,000177 m
Apt 9, St James'S Court, Echnlin StreetMar 2026€280,000212 m
48 The Maltings, Bonham St, Dublin 8Apr 2026€280,000301 m
25 The Maltings, Bonham Street, Dublin 8May 2025€264,000301 m
56 The Maltings, Bonham Street, Dublin 8Apr 2025€228,000301 m
36 The Maltings, Bonham St, Dublin 8Mar 2026€277,500301 m
205 Phoenix View, Jamess St, Dublin 8Jul 2025€265,000320 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 June 2022
  2. Decision due19 August 2022
  3. Decision issued4 July 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.