Planning Permission Ireland
GrantedInfrastructureDecided 5 June 2025

Terminal 4 North Lands, Dublin Port, Dublin 1, bounded by Bond Road, Tolka Quay Road & Promenade Road

Extension of duration for the demolition of 10 buildings and creation of a storage yard at Dublin Port.

4483/19/X1 · Dublin City Council · Lodged 10 April 2025

Reference
4483/19/X1
Authority
Dublin City Council
Register status
Decided
Received
10 April 2025

Summary

AI-generated

An extension of duration is sought to demolish 10 redundant buildings and clear the site for a multi-functional storage yard, primarily for heavy goods vehicles. The project includes check-in booths, security fencing, high mast lighting, and CCTV.

Infrastructureportdemolitionindustrialhgv
Floor area
6,830 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Ext. Of duration: the proposed development will consist of the demolition of 10 no. Redundant buildings (c. 6830sqm) and removal of temporary structures including portacabins and general site clearance (an existing substation and pump house will remain in situ) to optimise the use of the site as a multi-functional storage yard (primarily for heavy goods vehicles) and facilitate wider infrastructural upgrades to provide additional capacity within the port. The proposed development will also include: construction of vehicular check-in booths (c. 30sqm); an open-air blockwork electrical enclosure; amendments to boundary treatments including provision of 4m high security fencing (including 1.5m high retaining walls) on the northern, eastern and southern boundaries; 4m high security fencing fixed to the existing masonry wall along the western boundary with bond road; 3 no. New 12m wide automatic vehicular sliding gates and re-building of 1 no. Existing 9m wide automatic vehicular sliding gate; provision of 14 no. High mast lighting columns (30m high) and 54 no. Perimeter lighting columns (12m high); installation of 9 no. Cctv columns (18m high); installation of new pavement, underground drainage, attenuation, interceptors, water services and electrical infrastructure; installation of new wash bay and fuel spill areas; installation of pedestrian barriers; and all associated site and development works on a site of c. 9.52ha.

Key dates

Timeline

  1. Application received10 April 2025
  2. Decision due5 June 2025
  3. Decision issued5 June 2025
  4. Permission expiry18 January 2031

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.