Planning Permission Ireland
GrantedAlterationsDecided 25 February 2020

Site Tom Kelly Road/Charlemont Street, Dublin 2, D02 P489

Repositioning of an approved ESB substation and switchroom at Charlemont Square.

4822/19 · Dublin City Council · Lodged 23 December 2019

Reference
4822/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
23 December 2019

Summary

AI-generated

The development consists of amendments to a previously permitted scheme. It proposes repositioning the approved ESB substation and switchroom to a position inside the wall along the southern boundary of the site.

Alterationssubstationinfrastructure
Storey
1
Floor area
26 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of amendments to block 4 which forms part of a previously permitted development dcc reg. Ref. 3742/10 (abp ref. Pl29s. 238212), as subsequently amended by planning permission dcc reg. Ref. 4443/16 and dcc reg. Ref. 3416/18. The development includes the proposed repositioning of the approved esb substation and switchroom which will serve block 4 of the charlemont square development to a position inside the wall along the southern boundary of the subject site. The substation and switchroom will consist of a single, flat roofed, single-storey structure with an internal floor area of 25.7 sq. M and measuring 3.15m in height.

Land-use zoning

What this land is zoned for

Z10: Inner Suburban and inner City Sustainable Mixed-UsesRE
To consolidate and facilitate the development of inner city and inner suburban sites for mixed-uses.

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
602 Shelbourne Plaza, Ringsend Rd, Dublin 4Jun 2026€700,00026 m
42b South Richmond St, Dublin 2, DublinApr 2026€90,000116 m
15 Charlemont Mall, Portobello, Dublin 2May 2025€800,000121 m
76 Harcourt Green, Charlemont St, Dublin 2May 2026€725,000128 m
77 Harcourt Green, Charlemont St, Dublin 2Dec 2025€315,000128 m
51 Harcourt Green, Charlemount St, Dublin 2Jul 2025€545,000129 m
Apt 34, Harcourt Green, Charlemont St Dublin 2Jun 2026€335,000129 m
1 Harcourt Green, Charlemont St, Dublin 2Sept 2025€460,000147 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 December 2019
  2. Decision due25 February 2020
  3. Decision issued25 February 2020
  4. Grant issued14 May 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.