Planning Permission Ireland
GrantedCommercialDecided 1 April 2025

Former Trim Transport Ltd Yard, Tolka Quay Road, Dublin Port, Dublin 1

Construction of a modular office building, storage container, and solar panels at Dublin Port.

WEB2500/24 · Dublin City Council · Lodged 14 November 2024

Reference
WEB2500/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
14 November 2024

Summary

AI-generated

The development at a former transport yard consists of constructing a single-storey modular office building with two solar photovoltaic panel arrays. It also includes a storage container, bicycle store, new boundary fencing, and access gates.

Commercialsolarofficeport
Storey
1
Floor area
208 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For development at this site at the former trim transport ltd yard, tolka quay road, dublin port, dublin 1, d01 h977. The subject site comprises of c. 0.147ha within the overall former trim transport ltd site. The development will consist of
  • The construction of a single storey modular office building (180sqm) with 2 no. Solar photovoltaic panel arrays at roof level and external heat pumps to the rear
  • The provision of a storage container (28sqm) to accommodate ancillary storage and a secure sheltered bicycle store
  • The provision of site lighting and utility connections
  • The replacement of existing access gates with a new 2.25m high vehicular double swing gate and a new 2.25m high pedestrian double swing gate with a 2.5m high concrete wall panel and pier
  • The provision of a 2.5m high chain link fence along the northern boundary
  • Repairs to / renewal of existing boundary treatments where required; and
  • The provision of ancillary car parking, landscaping, servicing and all associated site works

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received14 November 2024
  2. Decision due1 April 2025
  3. Decision issued1 April 2025
  4. Permission expiry6 May 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.