Planning Permission Ireland
InvalidExtensionDecided 7 January 2025

68 Arran Street East conjoined with 18 Ormond Quay Upper, Dublin 7

A rear extension, external insulation, and internal alterations to a protected structure.

WEB2806/24 · Dublin City Council · Lodged 20 December 2024

Reference
WEB2806/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 December 2024

Summary

AI-generated

The development consists of a small 3.5 square metre single-storey rear extension and external insulation works to the rear elevation of a protected structure. Internal alterations include the partial removal of a mezzanine floor to reinstate a double-height space, stair upgrades, and general repair and restoration works.

Extensionprotected structureextensionrenovation
Floor area
4 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of a single-storey rear extension of 3.5m2, reordering of soil and rainwater pipes, removal of cementious render and application of new breathable external insulation to rear elevation; new hanging sign to front façade; internal alterations consisting of partial removal of later mezzanine floor to reinstate double height space, upgrading of stair enclosure to 30-minute fire resistance and new balustrade at first floor level; repair and restoration works to floors, wall finishes and joinery, and upgrading of building services. No works are proposed to 18 ormond quay upper.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
23c Ormond Quay, 23 Ormond Quay, Dublin 1May 2025€350,00034 m
23a Ormond Quay, 23 Ormond Quay, Dublin 1May 2025€350,00034 m
23b Ormond Quay, 23 Ormond Quay, Dublin 1May 2025€350,00034 m
60 Arran Street East, Ormond Quay, Dublin 7Mar 2026€405,00049 m
17 Strand Street Little, Smithfield, Dublin 7Apr 2025€636,00060 m
11 Ormond Sq, Dublin 7, DublinFeb 2025€555,000107 m
69 Chancery St, Smithfield, Dublin 7Jan 2026€560,000116 m
67, Chancery Street, Ormond Quay Upper Dublin 7not full market priceMay 2026€240,000121 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2024
  2. Decision due21 February 2025
  3. Decision issued7 January 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.