Planning Permission Ireland
GrantedCommercialDecided 25 January 2019

Site of the previously permitted Block B4 (c.0.33 ha) of the Beacon South Quarter mixed use scheme, located at the junction of Blackthorn Drive and Blackthorn Road, Sandyford Business Estate, Dublin 18

Construction of a mixed-use scheme ranging from 1 to 14 storeys to complete the Beacon South Quarter development.

D18A/0785 · Dun Laoghaire Rathdown County Council · Lodged 21 December 2018

Reference
D18A/0785
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
21 December 2018

Summary

AI-generated

This application proposes a mixed-use scheme of approximately 13,076 square metres to substantially complete the Beacon South Quarter development. The building will range in height from 1 to 14 storeys, including a ground floor mezzanine, and will be built over three existing basement levels.

Commercialmixed usehigh risebasement
Storeys
14
Floor area
13,076 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development. The proposed development will substantially complete the beacon south quarter scheme and will be constructed over 3 no. Existing basement levels which extend beneath the subject site as permitted under dun laoghaire-rathdown county council planning reg. Ref. D04a/0618 as amended. The proposed development comprises a mixed-use scheme (c. 13,076 m2) ranging in height from 1
  • 14 storeys, including a ground floor mezzanine level, arranged around a communal area of o

Land-use zoning

What this land is zoned for

Objective MICUC
MIC To consolidate and complete the development of the mixed use inner core to enhance and reinforce sustainable development.

National zoning type: Other mix of uses

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 412, Beacon South Quarter, Sandyford Dublin 18Sept 2025€456,00057 m
Apt 610, Block A3, Beacon South QuarterDec 2025€650,000115 m
Apt 601 Cube 3, Beacon South Quarter, SandyfordJan 2026€335,000115 m
Apt 24 The Cubes 3, Beacon South Quarter, Sandyford Dublin 18Feb 2026€442,000115 m
Apt 409, The Cubes 3, Beacon South Quarter Dublin 18Aug 2025€375,000115 m
Apt 200, The Cubes 3, Beacon South Quarter Dublin 18Dec 2025€430,000115 m
Apt 603, Cubes 3, Beacon South Quarter Dublin 18May 2025€342,000115 m
Apt 400 Cubes 3, Beacon South Quarter, Sandyford Dublin 18May 2026€356,000115 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 December 2018
  2. Decision issued25 January 2019
  3. Appeal submitted19 February 2019
  4. Appeal decided17 June 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.