Planning Permission Ireland
GrantedAlterationsDecided 18 May 2026

10, Corrig Avenue, Dun Laoghaire, Dublin, A96PX72 (A Protected Structure)

Internal and external alterations, a new deck, and solar panels at a protected house in Dun Laoghaire.

D26A/0225/WEB · Dun Laoghaire Rathdown County Council · Lodged 24 March 2026

Reference
D26A/0225/WEB
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
24 March 2026

Summary

AI-generated

The works to this protected structure include creating an internal wall opening, replacing a sunroom with a deck, widening the side gate for vehicular access, and installing solar panels on the rear roof. It also includes window replacements and general roof repairs.

Alterationsprotected structuresolarrenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of works to a protected structure
  • On the entrance floor level, add an opening in the internal wall between the living and dining room
  • Demolish existing sunroom and replace with a deck
  • Widen existing gate on side elevation to facilitate vehicular access
  • Renewal of render
  • Replace stairs linking lower ground floor level to entrance floor level
  • On the entrance floor level, extension of window in the rear to allow for french doors
  • On the first floor, construct a temporary wall to divide the existing bedroom
  • The replacement of non-original pvc windows with timber framed sash windows
  • Provision for solar panels on the rear slated roof
  • Repair and restoration of the existing main slate roof. All along with associated general restoration & decoration works, site works, services and landscaping

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10 Corrig Ave, Dun Laoghaire, DublinNov 2025€1,286,2501 m
The Coach House, Sydenham Mews, Corrig AvenueJan 2026€750,00051 m
34 Northumberland Avenue, Dunlaoughaira, Co DublinDec 2025€1,900,00097 m
Apartment 2, Brook House, Corrig AvenueFeb 2025€462,000109 m
5 Brook House, Corrig Avenue, Dun LaoghaireAug 2025€450,000109 m
4 Clarinda Court, Clarinda Park West, Dun LaoghaireJan 2025€630,000127 m
15 Northumberland Ave, Dun Laoghaire, DublinMay 2025€1,250,000128 m
1 Clarinda Court, Clarinda Park West, Dun LaoghaireApr 2025€582,000129 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 March 2026
  2. Decision due19 May 2026
  3. Decision issued18 May 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.