Planning Permission Ireland
GrantedAlterationsDecided 20 November 2023

Plot 2B, Blanchardstown Corporate Park 2, Ballycoolin, Dublin 15

Amendments to a permitted light industrial building, including facade changes and roof alterations.

FW23A/0306 · Fingal County Council · Lodged 11 October 2023

Reference
FW23A/0306
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
11 October 2023

Summary

AI-generated

The application seeks permission to amend a previously permitted scheme on a 0.53 hectare site. Changes include alterations to building facades, replacing a sloped roof with a hipped roof, reducing the parapet height, and a minor increase in site area.

Alterationsindustrialamendment

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development to amend a previously permitted scheme (reg. Ref fw22a/0291) at this c. 0.53 ha site known as plot 2b,blanchardstown corporate park 2,ballycoolin, dublin
  • The lands are generally bounded by maxol service station ballycoolin to the north-east, the n2/ n3 link road to the west and undeveloped lands to the south. The development will consist of: changes to the building facades, including alterations to the material finishes on all elevations (north-west, south-west, south-east and north-east) and changes to the curtain walling; replacement of the sloped roof with a hipped roof on the mail light industrial building; provision of roof lights and the omission of the automatic opening vents (aovs); reduction of the parapet upstands of the light industrial unit (c. 1m) and the reduction of the internal height of the light industrial unit (c. 0.5m). (the maximum parapet height of the permitted light industrial unit will decrease by c. 1.5m and the maximum ridge height will decrease by c. 0.5m. The height of the ancillary office will remain unchanged). The development will also include: the minor increase in site area (c. 38 sq. M) to facilitate the provision of 2 no. Pedestrian and cyclist crossings dished down to the road level to the north-east of the site; the provision of 2 no. Additional ev charging points and associated ducting (the overall quantum of 35 no. Car parking spaces will remain unchanged); minor alterations to the hard and soft landscaping areas; changes in levels; and all associated site excavation and development works above and below ground. (the total gross floor area of the permitted under reg. Ref fw22a/0291 will remain unchanged (c. 1,762 sq. M))

Land-use zoning

What this land is zoned for

HT - High TechnologyCOE
Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

National zoning type: Office, business/technology park and related

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received11 October 2023
  2. Decision due5 December 2023
  3. Decision issued20 November 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.