Planning Permission Ireland
GrantedInfrastructureDecided 24 July 2024

Orion Business Park, Ballycoolin, Dublin 15, D15 XE2N

Modifications to a permitted data centre development in Ballycoolin, including revised plant yards and a battery storage system.

FW24A/0246E · Fingal County Council · Lodged 11 June 2024

Reference
FW24A/0246E
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
11 June 2024

Summary

AI-generated

The application seeks modifications to previously permitted data centre developments (FW17A/0167 and FW18A/0114). Changes include revised layouts for three plant yards, a new gas pressure reduction station, energy centres, fuel storage tanks, a battery energy storage system (BESS), and minor building modifications.

Infrastructuredata centreenergy storageinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The application for planning permission consists of modifications to permission ref. Fw17a/0167 (for demolition of existing warehouse and construction of 3 no. Data centres and associated works) and permission ref. Fw18a/0114 (amendments to the permitted 3 no. Data centres and associated works). The proposed modifications will comprise the following: revised layout of plant yard no. 1 to provide a new gas pressure reduction station (gprs), revised energy centre, modifications to permitted flue design, and alteration of hv building to mv building and revised design; revised layout of plant yard no. 2 to provide revised energy centre, modifications to permitted flue design, fuel storage tanks, and combined services building; revised layout of plant yard no. 3 to provide revised energy centre, modifications to permitted flue design, and alteration of hv building to mv building and revised design, new battery energy storage system (bess); modifications to internal access and landscape areas to accommodate redesigned plant yards; ancillary infrastructure including revised sprinkler tank and pumphouse location; minor modifications to rear loading of buildings no. 1, 2 and 3; and all associated works ancillary to the modifications. The proposed modifications will also include a temporary energy generation compound for a period of c. 1.5 year. The temporary modifications include: installation of 4 no. Gas powered generators and 4 no. Bio diesel (hvo) generators (including biodiesel storage) used in standby application; each generator will include a 12 m tall flue stack; 2 no. Battery storage area and a battery inverter station; installation of 6 no. Containerised switchgear rooms and 6 no. Transformers; and ancillary equipment including fuel interceptor. Following the temporary period, data centre building no. 2 will be developed in accordance with the layout and design as permitted by fw18a/0114 including the modifications proposed in this application. The temporary works will be removed once energy centre no. 1 and 2 have been commissioned. The remainder of the development is to be carried out in accordance with parent permission reg ref. Fw17a/0167, amendment permission fw18a/0114, and any subsequent amendments permitted by this application for planning permission.

Land-use zoning

What this land is zoned for

HT - High TechnologyCOE
Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

National zoning type: Office, business/technology park and related

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received11 June 2024
  2. Decision due2 August 2024
  3. Decision issued24 July 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.