Planning Permission Ireland
GrantedEnergyDecided 10 February 2026

On a site comprising an area of existing hard standing to the north of the existing Hexagon Building and to the east of existing Building C. IDA Blanchardstown Business and Technology Park, Ballycoolin Road and Snugborough Road, Blanchardstown., DUB

Installation of a battery energy storage system compound in place of 22 parking spaces.

FW25A/0535E · Fingal County Council · Lodged 23 July 2025

Reference
FW25A/0535E
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
23 July 2025

Summary

AI-generated

The development consists of removing 22 existing parking spaces to construct a 553.8 square metre Battery Energy Storage System (BESS) compound. The compound will feature four containerised battery units, an electrical transformer, security fencing, and associated electrical connections.

Energybessbatteryinfrastructureenergy
Floor area
554 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission is sought for: - removal of 22 parking spaces to accommodate the proposed development. - provision of a battery energy storage system (bess) compound with a total area of c. 553.8 sq. M. Comprising four containerised battery units and one electrical transformer. The self-contained battery units will have a maximum height of c. 3 m and will be c. 8.8 m in length and c. 1.65 m in width. The transformer will have a maximum height of c. 3.25 m and will be c. 4.75 m in length and c. 4 m in width. - the proposed battery compound will be enclosed with security fencing to a maximum height of 2.7m with entrance gates along the southern boundary and western boundary. - all associated development including electrical connections, landscaping and planting, boundary treatments, cctv, lighting, and all associated ancillary works.

Land-use zoning

What this land is zoned for

HT - High TechnologyCOE
Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

National zoning type: Office, business/technology park and related

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received23 July 2025
  2. Decision due11 February 2026
  3. Decision issued10 February 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.