Taduff West and Taduff East and Mihanboy, Athlone, Co Roscommon
A 10-year permission for an 80MW Battery Energy Storage System (BESS) facility.
23197 · Roscommon County Council · Lodged 16 May 2023
- Reference
- 23197
- Authority
- Roscommon County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 16 May 2023
Summary
AI-generatedThe applicant seeks a ten-year planning permission for the construction of an 80MW Battery Energy Storage System (BESS) facility adjacent to a consented solar park. The development will include up to 22 battery storage bays, containerised modules, a switchgear/substation unit, a storage/office unit, a control room, and a new 1,050m access track.
- Floor area
- 100 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Permission for development consisting of : (i) a ten-year planning permission for the construction of a permanent battery energy storage system (bess) facility adjacent to the consented tdc community solar park (pl. Ref. 20/36 & pl. Ref. 21/350) with capacity of c. 80mw; (ii) the provision of up to 22 no. Battery storage bays, each with 8 no. Containerised battery modules connected to 2 no. Inverters per bay and 1 no. Transformer per bay; (iii) the containerised modules will typically house battery racks with multiple battery cells, control systems, fire detection and fire suppression systems and cooling systems; (iv) the provision of a bess switchgear / substation unit (c. 33.2 sq m), storage/office unit (c. 33.2 sq. M) and a control room (c. 33.2 sq. M), all provided in standard containerised units; (v) the construction of a new access track (c. 1,050m) linking the proposed bess facility to the consented tdc community solar park including 1 no. Water crossing point; this will facilitate both construction and operational access while the entrance to the overall tdc community solar park remains via the l2026 as consented under pl ref. 20/36. (vi) minor amendments to the layout of the permitted solar farm (pl ref. 20/36 & pl. Ref. 21/350) comprising the removal of permitted panels to accommodate the proposed access track; (vii) the provision of 2 no. Car parking spaces adjacent to the bess substation control room and 1 no electric vehicle charging point; (viii) all associated site development works and ancillary infrastructure above and below ground including drainage, security fencing, security lighting, landscaping (including additional planting) and ancillary grid infrastructure (a natura impact statement (nis) has been submitted with the planning application) at
Key dates
Timeline
- Application received16 May 2023
- Decision due10 July 2023
- Decision issued10 July 2023
- Grant issued16 August 2023
- Permission expiry15 August 2028
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
For 10 year planning permission for the development which will consist of the construction of a Battery…
Tigroe , Kilmeaden , County Waterford
2560872WaterfordLodged 5 Dec 2025
- GrantedEnergy
The proposed development will consist of a battery energy storage system (BESS) located within a fenced…
a c. 1.7 ha site located within the ESB Inchicore substation site, specifically lands south of Kylemore Way and northwest of the existing ESB Substation, Kylemore Way, Dublin 8, D08 E398 and to the immediate west of the Kylemore BESS, Kylemore Road, Dubli
WEB2226/25Dublin CityLodged 30 May 2025
- GrantedEnergy
Planning permission is sought for — Removal of 22 parking spaces to accommodate the proposed development
On a site comprising an area of existing hard standing to the north of the existing Hexagon Building and to the east of existing Building C. IDA Blanchardstown Business and Technology Park, Ballycoolin Road and Snugborough Road, Blanchardstown., DUB
FW25A/0535EFingalLodged 23 Jul 2025
- GrantedEnergy
Planning permission for the development of a Battery Energy Storage System (BESS) designed to provide system…
Tawlaght & Srabragan , Lough Allen , County Roscommon
2360265RoscommonLodged 13 Dec 2023
- Awaiting decisionEnergy
For a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS…
Industrial Development Agency (IDA) Business and Technology Park , Purcellsinch , Dublin Road
19482KilkennyLodged 12 Jul 2019
- Awaiting decisionEnergy
Permission for — 1no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to…
Ballynanelagh Knockraha Co. Cork
25/4155corkLodged 7 Feb 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.