GrantedEnergyDecided 10 July 2023

Taduff West and Taduff East and Mihanboy, Athlone, Co Roscommon

A 10-year permission for an 80MW Battery Energy Storage System (BESS) facility.

23197 · Roscommon County Council · Lodged 16 May 2023

Reference
23197
Authority
Roscommon County Council
Register status
Decided
Type
PERMISSION
Received
16 May 2023

Summary

AI-generated

The applicant seeks a ten-year planning permission for the construction of an 80MW Battery Energy Storage System (BESS) facility adjacent to a consented solar park. The development will include up to 22 battery storage bays, containerised modules, a switchgear/substation unit, a storage/office unit, a control room, and a new 1,050m access track.

Energybattery storagebessenergysolar
Floor area
100 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development consisting of : (i) a ten-year planning permission for the construction of a permanent battery energy storage system (bess) facility adjacent to the consented tdc community solar park (pl. Ref. 20/36 & pl. Ref. 21/350) with capacity of c. 80mw; (ii) the provision of up to 22 no. Battery storage bays, each with 8 no. Containerised battery modules connected to 2 no. Inverters per bay and 1 no. Transformer per bay; (iii) the containerised modules will typically house battery racks with multiple battery cells, control systems, fire detection and fire suppression systems and cooling systems; (iv) the provision of a bess switchgear / substation unit (c. 33.2 sq m), storage/office unit (c. 33.2 sq. M) and a control room (c. 33.2 sq. M), all provided in standard containerised units; (v) the construction of a new access track (c. 1,050m) linking the proposed bess facility to the consented tdc community solar park including 1 no. Water crossing point; this will facilitate both construction and operational access while the entrance to the overall tdc community solar park remains via the l2026 as consented under pl ref. 20/36. (vi) minor amendments to the layout of the permitted solar farm (pl ref. 20/36 & pl. Ref. 21/350) comprising the removal of permitted panels to accommodate the proposed access track; (vii) the provision of 2 no. Car parking spaces adjacent to the bess substation control room and 1 no electric vehicle charging point; (viii) all associated site development works and ancillary infrastructure above and below ground including drainage, security fencing, security lighting, landscaping (including additional planting) and ancillary grid infrastructure (a natura impact statement (nis) has been submitted with the planning application) at

Key dates

Timeline

  1. Application received16 May 2023
  2. Decision due10 July 2023
  3. Decision issued10 July 2023
  4. Grant issued16 August 2023
  5. Permission expiry15 August 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.