Planning Permission Ireland
GrantedCommercialDecided 23 January 2020

THE WOODLAND AND FORMER COACH HOUSE, ADJACENT TO AGHADOE HOUSE, KNOPPOGE

Conservation and conversion of a derelict 19th-century coach house into a craft distillery, cafe, restaurant, and bar.

19565 · Kerry County Council · Lodged 29 May 2019

Reference
19565
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
29 May 2019

Summary

AI-generated

This application proposes the conservation, refurbishment, and reuse of a derelict 19th-century coach house and courtyard within the curtilage of Aghadoe House, a protected structure. The complex will be sensitively converted into a craft distillery, featuring a cafe, restaurant, bar, retail space, mill, and ancillary offices.

Commercialdistilleryconservationprotected structuretourism
Floor area
654 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Conservation and refurbishment of the derelict nineteenth century coach house and adjoining courtyard (381m2) located within the curtilage of aghadoe house (a protected structure (rps-ky-21306614) for sensitive incorporation and reuse as part of a craft distillery, including reinstatement of roof, addition of a glazed canopy to form a covered entrance space and minor alterations to accommodate a reception area, cafe, restaurant, bar facilities and retail space at ground floor. Reinstatement of perimeter buildings within the existing courtyard in place of lost historic structures to accommodate cafe, restaurant, bar facilities (74m2) and mill (36m2), and additions to existing outbuildings (42m2) to accommodate kitchen, stores, staff facilities and a new electricity substation. Removal of ruined lean to structures (55m2) and twentieth century timber framed shed (18m2) and concrete water tank (15m2). Reinstatement of first floor mezzanine level (102m2) with attendant stairs and lift to accommodate an ancillary office and visitor sanitary facilities. Works to conserve, repair and exend the partly demolished stone wall forming the boundary with aghadoe house, making provision for preservation of an existing walking route between the nearby r563 road junction and fossa primary school, and reinstatement of external ground surfaces within the courtyard and forecourt. Construction of a new 690m2 still house /multipurpose event space accommodating distillation process equipment, tasting area, bar facilities, lower ground floor mechanical area, ancillary plant space, distilling staff accommodation, testing laboratory and attendant external storage silos, process vessels, co-product storage vessels, cooling tower, ph balance tank, underground lpg storage, underground firefighting water storage and all ancillar y site development and landscape works while providing for preservation of mature and specimen trees. Construction of a new 460m2 maturation storage building including cask filling and disgorging facilities, bottling station and all ancillary site development and landscape works while providing for preservation of mature and specimen trees. Construction of a new entrance and internal roadway from the r563 sensitively incorporated within the woodland to provide sole vehicular access to the site with attendant lighting, signage, gate and landscaping works and provision of associated car, bicycle and coaching parking. (see newspaper ad. )

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 The Lake District, Aghadoe, KillarneySept 2025€525,000182 m
Breffni House, Aghadoe, KillarneyNov 2025€580,000341 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 May 2019
  2. Further information requested22 July 2019
  3. Further information received24 October 2019
  4. Decision due23 January 2020
  5. Decision issued23 January 2020
  6. Grant issued15 July 2020
  7. Appeal submitted17 February 2020
  8. Appeal decided15 July 2020
  9. Permission expiry14 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.