Planning Permission Ireland
RefusedApartmentsDecided 15 December 2020

TOWERS HOTEL, KILNABRACK UPPER, GLENBEIGH

Construction of a new 1.5-storey building with 8 accommodation units at Towers Hotel.

201009 · Kerry County Council · Lodged 22 October 2020

Reference
201009
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
22 October 2020

Summary

AI-generated

The development consists of a new traditional-style 1.5-storey stepped terrace building containing 8 hotel accommodation units. This includes four studio apartments at ground floor, four studio apartments at first floor, and four two-bedroom cottages, alongside additional car parking and a new effluent treatment plant.

Apartmentshoteltourismaccommodation
Residential units
8
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A) create additional hotel accommodation within a new traditional style 1½ storey, 8 unit stepped terrace type building form. Units 1, 2, 3 and 4 will each contain a studio apartment at ground floor level and a studio apartment at first floor level. Units 5, 6, 7 and 8 will each be a two bedroom cottage with living areas at ground floor level and bedrooms at first floor level. B) create additioanl car parking, linking the two existing car parking areas internally. C) reduce the number of entry/exit points (from three entry points and three exit points ) to two number entry points and one only exit point on the n70 road. Served by an effluent treatment plant and sand polishing filter together with all associated site works including water attenuation measures

Land-use zoning

What this land is zoned for

Village CentreUC
Village Centre zoning which caters for a mix of uses.

National zoning type: City/Town/village Centre, central area

Objective set by the Kenmare Municipal District Local Area Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10 Emir Court, Glenbeigh, Co KerryMar 2026€230,000231 m
9 Clearwater, Glenbeigh, KerryAug 2025€350,000286 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 October 2020
  2. Decision due16 December 2020
  3. Decision issued15 December 2020
  4. Appeal submitted14 January 2021
  5. Appeal decided18 August 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.