Upgrading and refurbishment of a 4.6km section of an overhead electricity line in Kerry.

21635 · Kerry County Council · Lodged 11 June 2021

Reference
21635
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
11 June 2021

Summary

AI-generated

The development consists of refurbishment and upgrading works along a 4.6km section of the 20kV Glencar overhead electricity line. Works include replacing existing poles, installing two new poles up to 12m high, and installing a new 3-phase conductor. A Natura Impact Statement will be submitted.

Infrastructureelectricitygridinfrastructureupgrade

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Development along a 4.6km long section of an existing 20kv overhead electricity line (referred to as "the glencar line") located between structures 143 to 196 inclusinve. The development consists of refurbishment and upgrading works including (where necessary) replacement of existing poles, and the provision of 2 no. New poles, along the existing overhead electricity line. Replacement poles will be constructed at, or immediately adjacent to the existing structures that they will replace. Replacement and new poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Additional upgrade works will include: installation of stays; replacement of existing equipment e. G. Headgear, installation of additional equipment; installation of a new 3 phase conductor along the full length of the line; and all associated ancillary works including the provision of temporary accessways. A natura impact statement (nis) will be submitted with this application

Key dates

Timeline

  1. Application received11 June 2021
  2. Decision due5 August 2021
  3. Decision issued5 August 2021
  4. Grant issued8 September 2021
  5. Permission expiry7 September 2026

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.