Planning Permission Ireland
GrantedInfrastructureDecided 9 April 2026

Kerry Technology Park, Dromthacker, Tralee

Construction of a 38 kV/MV electrical substation at Kerry Technology Park in Tralee.

2561153 · Kerry County Council · Lodged 10 December 2025

Reference
2561153
Authority
Kerry County Council
Register status
Decided
Type
PERMISSION
Received
10 December 2025

Summary

AI-generated

The ESB is applying for permission to develop a 38 kV/MV Gas Insulated Switchgear (GIS) electrical substation on a 1.31-hectare site. The development will feature a 2,006 square metre compound enclosed by walls and fencing, containing prefabricated GIS modules and a control room.

Infrastructuresubstationinfrastructureesbutility

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Electricity supply board (esb) intends to apply for permission for development of a 38 kv/mv gas insulated switchgear (gis) electrical substation at this site (1.31ha) at kerry technology park, dromthacker, tralee, co. Kerry. The site is generally bound to the north by the kerry technology park access road (subject to planning permission ref: 2360295); to the east by the rear of residential properties; to the south by the knockawaddra road and the rear of residential and commercial properties along the knockawaddra road and to the west by an existing office building and associated car parking area. The proposed development will consist of
  • Construction of a substation compound of approximately 2,006m2 gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation
  • 1 no. Prefabricated 38 kv gis module and foundation (c. 31.0m2 and c. 5.1 m high)
  • 1 no. Prefabricated mv gis module and foundation (c. 34.0 and c. 4.6m high)
  • 1 no. Prefabricated control room module and foundation (c. 34.0m2 and c. 4.6 m high)
  • 2 no. 38/20 kv 10 mva transformers and associated bunds (c. 45.85m2, c. 4.7 m high ea. )
  • 1 no. House transformer (c. 7.4 m2 and c. 1.3 m high); and
  • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables
  • Internal access road within the proposed substation compound
  • Site access road and footpath from the existing internal technology park road and footpath
  • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works

Land-use zoning

What this land is zoned for

Education, Innovation, Research & DevelopmentCD
For the provision of Education/Innovation/Research & Development. See also objective no. KCDP TR-23

National zoning type: Other commerce/industrial/enterprise uses

Objective set by the Tralee Municipal District Settlements's Plan (Variation No. 1 of the KCDP 2022-2028) (2025–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
The Old Schoolhouse, Dromtacker, TraleeJan 2026€90,000191 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 December 2025
  2. Further information requested11 February 2026
  3. Further information received16 March 2026
  4. Decision due12 April 2026
  5. Decision issued9 April 2026
  6. Grant issued13 May 2026
  7. Permission expiry12 May 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.