Kerry Technology Park, Dromthacker, Tralee
Construction of a 38 kV/MV electrical substation at Kerry Technology Park in Tralee.
2561153 · Kerry County Council · Lodged 10 December 2025
- Reference
- 2561153
- Authority
- Kerry County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 10 December 2025
Summary
AI-generatedThe ESB is applying for permission to develop a 38 kV/MV Gas Insulated Switchgear (GIS) electrical substation on a 1.31-hectare site. The development will feature a 2,006 square metre compound enclosed by walls and fencing, containing prefabricated GIS modules and a control room.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Electricity supply board (esb) intends to apply for permission for development of a 38 kv/mv gas insulated switchgear (gis) electrical substation at this site (1.31ha) at kerry technology park, dromthacker, tralee, co. Kerry. The site is generally bound to the north by the kerry technology park access road (subject to planning permission ref: 2360295); to the east by the rear of residential properties; to the south by the knockawaddra road and the rear of residential and commercial properties along the knockawaddra road and to the west by an existing office building and associated car parking area. The proposed development will consist of
- Construction of a substation compound of approximately 2,006m2 gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation
- 1 no. Prefabricated 38 kv gis module and foundation (c. 31.0m2 and c. 5.1 m high)
- 1 no. Prefabricated mv gis module and foundation (c. 34.0 and c. 4.6m high)
- 1 no. Prefabricated control room module and foundation (c. 34.0m2 and c. 4.6 m high)
- 2 no. 38/20 kv 10 mva transformers and associated bunds (c. 45.85m2, c. 4.7 m high ea. )
- 1 no. House transformer (c. 7.4 m2 and c. 1.3 m high); and
- All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables
- Internal access road within the proposed substation compound
- Site access road and footpath from the existing internal technology park road and footpath
- All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works
Land-use zoning
What this land is zoned for
“For the provision of Education/Innovation/Research & Development. See also objective no. KCDP TR-23”
National zoning type: Other commerce/industrial/enterprise uses
Objective set by the Tralee Municipal District Settlements's Plan (Variation No. 1 of the KCDP 2022-2028) (2025–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| The Old Schoolhouse, Dromtacker, Tralee | Jan 2026 | €90,000 | 191 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received10 December 2025
- Further information requested11 February 2026
- Further information received16 March 2026
- Decision due12 April 2026
- Decision issued9 April 2026
- Grant issued13 May 2026
- Permission expiry12 May 2031
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted70 m away
CONSTRUCT A NEW SINGLE STOREY GENERATOR BUILDING WITH ALL ANCILLARY SITE WORKS ALL AT KERRY TECHNOLOGY PARK
DROMTACKER , TRALEE , CO KERRY
17349KerryLodged 19 Apr 2017Industrial
- Granted140 m away
(A) RETAIN AND COMPLETE AN AGRICULTURAL SHED TO HOUSE LIVESTOCK, WITH UNDERGROUND TANKS (B) AND ALL…
DROMTHACKER , BALLYBEGGAN , TRALEE
17402KerryLodged 2 May 2017Retention
- Granted180 m away
THE PROPOSED DEVELOPMENT WILL CONSIST OF (i) THE PARTIAL CHANGE OF USE OF EXISTING BUILDING AT GROUND FLOOR…
Kerry Technology Park Dromthacker & Knockawaddra West , Tralee , Co. Kerry
2460288KerryLodged 9 May 2024Commercial
- Granted300 m away
See site notice for full description. Below is a brief description set to the character limit of the Planning…
Kerry Technology Park , Dromthacker , Tralee
2360295KerryLodged 8 Nov 2023Industrial
- Granted320 m away
PERMISSION for amendments and alterations to the approved pharmaceutical ‘Fill-Finish’ production facility…
Kerry Technology Park , Dromthacker , Tralee
2460694KerryLodged 16 Sept 2024Alterations
- Granted380 m away
REDSIII for a c.125 kWp renewable energy solar PV installation consisting of up to c.575m2 (213No.) Roof…
MTU North Campus , Dromtacker , Tralee
267KerryLodged 19 Jan 2026Energy
- Awaiting decision440 m away
CONSTRUCT A NEW AT GRADE CAR PARK PROVIDING A TOTAL OF 94 PARKING SPACES ALONG WITH ALL ASSOCIATED SITE WORKS…
MUNSTER TECHNOLOGICAL UNIVERSITY , NORTH CAMPUS DROMTACKER , TRALEE CO KERRY
23531KerryLodged 10 May 2023Infrastructure
- Granted450 m away
CONSTRUCT A NEW AT GRADE CAR PARK PROVIDING A TOTAL OF 94 CAR PARKING SPACES ALONG WITH ALL ASSOCIATED SITE…
NORTH CAMPUS , DROMTACKER , TRALEE
23732KerryLodged 27 Jun 2023Infrastructure
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The development development on a 2.4 ha site will consist of a 38 kV electrical substation. The development…
A 2.4ha site located to the south of Batter Lane, and to the west of the M1, Belinstown, County Dublin
F23A/0643FingalLodged 25 Oct 2023
- Awaiting decisionInfrastructure
Development on a c. 0.2 ha site, on ESB lands. The development will consist of a physical extension of c. 701…
Lands at the existing Buttevant 38kV Station, Spital Townland, Buttevant, Co. Cork
205187corkLodged 11 Jun 2020
- GrantedInfrastructure
Permission for development at a c.1.6 ha site on ESB lands at the existing Tonroe 110kV Substation. The…
Kilcolman and Ballyoughter , Ballaghaderreen , Co. Roscommon.
2460173RoscommonLodged 18 Apr 2024
- Awaiting decisionInfrastructure
With the consent and approval of the Electricity Supply Board (ESB), for the construction of a new 220 kV Gas…
Maynooth 220kV Substation , Taghadoe , Co. Kildare
2360474KildareLodged 12 Dec 2023
- GrantedInfrastructure
Construction of a Gas Insulated Switchgear (GIS) compound measuring approximately 92.8m by 90.5m. The…
Existing Lanesboro Air Insulted Switchgear Substation and site of the former Lanesborough Power Station , townlands of Aghamore and Lanesborough , Lanesborough County Longford
2360056LongfordLodged 19 Jun 2023
- GrantedEnergy
For Permission for development of a 38kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site…
Lands at Cavan Business & Technology Park Dublin Road , Killygarry Cavan , Co. Cavan.
2660024CavanLodged 23 Jan 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.