Provision of a temporary contractor's car park and compounds for five years to support the Intel manufacturing facility expansion.

191413 · Kildare County Council · Lodged 19 December 2019

Reference
191413
Authority
Kildare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
19 December 2019

Summary

AI-generated

This application seeks a 5-year temporary permission for a contractor's car park for up to 300 cars and approximately 14 contractor compounds. The site works will support the Intel facility expansion and include site accommodation cabins, a temporary decrating building, and modifications to the existing entrance, footpath, and cycle lane.

Infrastructureinteltemporarycar parkindustrial

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Provision of a temporary contractor’s car park and contractor’s compound(s) for a period of 5 years, associated with the development of the proposed extended and revised manufacturing facility at intel, granted under an bord pleanála ref: 304672. The development will include
  • Modifications to existing site entrance and associated modifications to the existing adjacent footpath and cycle lane
  • Surface car park to accommodate 300 cars, maximum
  • Contractor compounds comprising approximately 14 no. Compounds ranging in area from 1,500 sq. M to 10,500 sq. M. Each compound will accommodate work cabins of single (3.5m) or double (7.0m) height, and a maximum of approximately 6-8 cabins (8m x 3m each)
  • Site accommodation which will include single storey - office canteen and welfare facilities, (c. 42mx12m) – entrance security cabin, (c. 7m x 3m) – compound security & welfare cabin (c. 12m x 3m) – toilet block (c. 12m x 6m) – bus shelter (c. 3m x 1.2m) – maintenance shed (c. 8m x 7m) – electrical substation/switchroom (c. 13m x 4.4m)
  • A c. 2,700sq. M temporary decrating building, measuring c. 40m x 69m, and 15m high, and associated c. 3,716sq. M nonpermeable maneuvering and operational space
  • Logistics & maintenance yard
  • Transport vehicle (truck) holding compound for approximately 30 units
  • Internal road network, site lighting, landscaping, mobile cranes and associated site works, security fencing to site and compound boundaries. A natura impact assessment (nis) accompanies this application and will be available for inspection at the office of the planning authority. Development is at a site of c. 14.95 hectares, bounded by the r449 to the east and the maynooth to leixlip railway line/royal canal to the north

Land-use zoning

What this land is zoned for

Enterprise and EmploymentSI
To provide for and facilitate the provision of high job-generating uses.

National zoning type: Industrial, enterprise, employment

Objective set by the Leixlip LAP 2020-2023 (2020–2026). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 The Rise, Westfield, LeixlipJan 2025€642,000384 m
16 The Rise, Westfield, LeixlipSept 2025€625,000390 m
3 The Grove, Westfield, LeixlipAug 2025€665,000398 m
6 The Grove, Westfield, LeixlipJun 2026€650,000402 m
6 The Rise, Westfield, LeixlipApr 2025€617,000425 m
28 The Park, Westfield, LeixlipSept 2025€654,111477 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 December 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.