GrantedIndustrialDecided 21 May 2026

Intel Ireland Limited, Collinstown Leixlip Blakestown Kellystown, Collinstown Industrial Park

Extension to the FAB34 manufacturing building and a new vehicular bridge at the Intel campus in Leixlip.

2660319 · Kildare County Council · Lodged 27 March 2026

Reference
2660319
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
27 March 2026

Summary

AI-generated

Intel Ireland is seeking permission for a 141 sqm, 25.7-meter-high elevated extension to the FAB34 building. The project also includes a new 236 sqm vehicular bridge, a truck turning area, and internal road modifications.

Industrialintelindustrialinfrastructurebridge
Storey
1
Floor area
141 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A minor extension to the existing fab34 manufacturing building (as permitted under kildare county council reg. Ref. 19/91 and an coimisiún pleanála ref. Pl09.30467), the addition of a vehicular bridge, modifications to existing internal road layout all to the south west of the intel site and 2no. Entrance signs at the existing south west entrances to the intel leixlip campus from the r148. The proposed minor modifications and reconfigurations comprise: (1) extension and alterations to the permitted fab34 manufacturing building. This will result in a single storey elevated extension to the existing building, approximately 141 square metres and approximately 25.7 metres in height, to the loading dock area to the south west of the existing fab34 manufacturing building on the west side of the intel site. (2) the addition of a new vehicular bridge, approximately 236 square metres, connecting the new loading dock to the grade-level road to the south of the fab34 manufacturing building. (3) addition of ancillary truck turning area, approximately 1,830 square metres, at the connection point of the new proposed vehicular bridge. (4) modifications to permitted landscaping layout, site lighting and drainage system. (5) the addition of 2no. Monument type entrance signs, approximately 1.6 metres high and 2.5 metres wide at the 2no. South west entrances to the intel site off the r148. This application consists of a variation to a previously permitted development for an activity for which a licence under part iv of the environmental protection agency act 1992 (as amended by the protection of the environment act, 2003) is required. This is a site to which the chemicals act (control of major accident hazards involving dangerous substances) regulations 2015 (s. I. 209 of 2015) applies

Land-use zoning

What this land is zoned for

Industry and WarehousingBP
To provide for industry, manufacturing, distribution and warehousing.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Leixlip LAP 2020-2023 (2020–2026). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received27 March 2026
  2. Decision due21 May 2026
  3. Decision issued21 May 2026
  4. Grant issued26 June 2026
  5. Permission expiry25 June 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.