Planning Permission Ireland
RefusedEnergyDecided 24 May 2022

Dunnstown, Brannockstown, Naas

Development of a synchronous condenser grid support facility on a 1-hectare site.

211371 · Kildare County Council · Lodged 24 September 2021

Reference
211371
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
24 September 2021

Summary

AI-generated

A 10-year planning permission is sought to develop a synchronous condenser grid support facility with a projected 50-year lifespan. The facility will regulate reactive power on the electricity network and include a 540 sqm building, cooling equipment, modular containers, and transformers.

Energygrid supportinfrastructureenergysubstation
Floor area
540 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For a 10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining esb dunnstown electricity substation in the townland of dunnstown, brannockstown, naas, co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. C. 10 m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside of the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. , c. 3m high); 6 no. Modular containers to house electrical and control equipment (total area of c. 195 sqm. , c. 5m high); a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 no. Firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining esb substation, balustrade boundary fencing, security entrance gate and cctv, all other ancillary and miscellaneous site works to include; site clearance; site access, internal roads development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the electricity supply board (esb) 220kv substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in section 2(1) of the electricity regulation act 1999. Revised by significant further information which consists of revised application site boundary to incorporate revised access arrangements to site from public road

Key dates

Timeline

  1. Application received24 September 2021
  2. Further information requested15 November 2021
  3. Further information received28 April 2022
  4. Decision due25 May 2022
  5. Decision issued24 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.