GrantedInfrastructureDecided 26 July 2022

Dunnstown, Brannockstown, Naas

An extension to the Dunnstown 400 kV substation to install series compensation equipment and a 53m high end mast.

211175 · Kildare County Council · Lodged 13 August 2021

Reference
211175
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
13 August 2021

Summary

AI-generated

EirGrid Plc. intends to extend the western boundary of the existing Dunnstown substation by approximately 154m by 138m. The development includes a 53m high double circuit end mast, three 28m high gantry structures, and three series compensation platforms.

Infrastructureinfrastructuresubstationgrid

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Eirgrid plc. With the consent and approval of the electricity supply board (esb), intend to apply for permission for development on lands to the west of the dunnstown 400 kv substation within the townland of dunnstown (td), brannockstown, naas, co. Kildare. The proposed development will consist of an extension to the western boundary of the existing dunnstown 400 kv substation to allow connection of series compensation equipment to the dunnstown-moneypoint 400 kv circuit. The extension will measure approximately 154m by 138m. Access to the compound will be via the existing substation entrance. The proposed development will comprise the following elements: (1) one 400 kv double circuit end mast (approximately 53m high) to facilitate the diversion of the overhead line into the compound and the decommissioning of existing overhead conductors and surge arrestors; (2) three 400 kv gantry structures to allow connection of the circuit to the series compensation equipment (approximately 28m high); (3) three series compensation platforms comprising of capacitor bank, metal oxide varistor, triggered air gap and discharge damping circuit (approximately 11m high to top of equipment on platform); (4) a communication and protection equipment control building (approximately 96.9m² and 5.5m high); (5) associated 400 kv electrical equipment including insulators, instrument transformers, overhead conductors, disconnectors, circuit breakers, surge arrestors, line traps, lightning masts and filter reactors; (6) all ancillary site development works including site preparation works, site clearance and levelling; hardstanding, internal access tracks and temporary construction compound; underground cabling and earthgrid, surface water drainage network including a soakaway; palisade (approximately 2.6m high) fencing and gates; lighting poles and landscaping as required to facilitate the development

Key dates

Timeline

  1. Application received13 August 2021
  2. Further information requested5 October 2021
  3. Further information received5 July 2022
  4. Decision due1 August 2022
  5. Decision issued26 July 2022
  6. Grant issued9 September 2022
  7. Permission expiry8 September 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.