Lackaghmore, Monasterevin, Co Kildare
Development of a renewable biogas and biofertiliser production facility in Monasterevin.
221035 · Kildare County Council · Lodged 23 August 2022
- Reference
- 221035
- Authority
- Kildare County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 23 August 2022
Summary
AI-generatedThe project proposes a renewable biogas and biofertiliser facility processing up to 165,000 tonnes of feedstock annually to feed into the national gas network. The facility will feature digester units, storage tanks, silage clamps, offices, and connection infrastructure.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The provision of a renewable biogas and biofertiliser production facility with an intake of up to 165,000 tonnes of feedstock per annum that will feed into the existing gas networks ireland (gni) network. The facility will comprise of: *input weigh bridges and weighbridge offices; *reception (incorporating offices, control room/laboratory, canteen, changing and toilet facilities) *feedstock building and solid digestate store; *boiler/plant maintenance including esb and chp store; *4 no digestor units and 1 no post digester unit, pre-acidification unit, biological desulphurisation and technical building all located within a containment bund; *covered storage tanks; * silage clamps; *connection to existing gas network ireland infrastructure the proposed development includes for associated biogas tank; gas upgrade units (5 no. ); and an emergency gas flare. The development also includes air cleaner (feedstock area); 5 no. Air cleaner stacks and 2 no. Boiler and chp plant flues; odour abatement, firefighting water tank; attenuation pond, a new gated access from r445; internal access roads, car parking, loading bays and laybys, landscaping and boundary fencing. A personnel gate is proposed to the north of the site. The proposed development comprises all associated site development, drainage and infrastructure works above and below ground. The maximum height of the proposed development is the digester units at c. 141m above ground level. The proposed facility will primarily utilise spent grains from breweries along with smaller quantities of other brewery by products such as yeast and discarded beer. Maize will also be accepted in smaller quantities as a feedstock to produce biogas which will be upgraded to bio methane and fed into the natural gas grid. Carbon dioxide will be recovered as a by-product as part of the process. Solid and liquid digestate that will be produced from the process will be a biofertiliser. No waste materials will be accepted as feedstock at the facility. An environmental impact assessment report (eiar) and natura impact statement (nis) have been prepared in respect of the proposed development on a site of approx. 7.9ha. Revised by significant further information which consists of revisions to the site access and works to the road and footpath alongside the site including the provision of public lighting, signage, anti-skid surfacing and a crash barrier. Tactile paving and dropped kerbs are proposed where required and there are c
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 11 September 2024.
Notified floor area: 3,331 m²
2 commencement notices are linked to this development.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received23 August 2022
- Further information requested17 October 2022
- Further information received28 April 2023
- Decision due22 June 2023
- Decision issued22 June 2023
- Grant issued22 November 2023
- Appeal submitted19 July 2023
- Permission expiry21 November 2028
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as…
Inchera Little Island Co.Cork
25/5034corkLodged 3 Jun 2025
- GrantedEnergy
Proposed erection of an agricultural biogas renewable energy facility, consisting of 3 no. primary digester…
Lunderstown , Duleek , Co. Meath
212347MeathLodged 15 Dec 2021
- Awaiting decisionEnergy
A period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2…
Thornhill and Annaholty , Birdhill , Co Tipperary
2560984TipperaryLodged 2 Oct 2025
- Awaiting decisionEnergy
A renewable biomethane facility on a c 2.75 hectare site to produce renewable energy and organic fertiliser.…
Oberstown , Ardee , Co. Louth
2360175LouthLodged 21 Jun 2023
- RefusedEnergy
The construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Cappanihane , Bruree , Co. Limerick
2560239LimerickLodged 24 Mar 2025
- RefusedEnergy
For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Ballyvass , Castledermot , Co. Kildare
2560920KildareLodged 12 Aug 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.