Planning Permission Ireland
GrantedCommercialDecided 24 June 2022

Lidl Regional Distribution Centre, Littleconnell, Newbridge Co. Kildare.

Temporary school tour farm and visitor facility at the Lidl Distribution Centre in Newbridge.

22503 · Kildare County Council · Lodged 3 May 2022

Reference
22503
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
3 May 2022

Summary

AI-generated

Permission is sought for a 10-year temporary school tour facility. It will feature an open visitor farm with demonstration paddocks, fruit and vegetable growing areas, two polytunnels, and a 76 sqm reception building.

Commercialfarmschool tourstemporary
Floor area
76 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For development (for a temporary period of up to 10 years) at the lidl regional distribution centre, littleconnell, newbridge, co. Kildare, w12 kt98, consisting of a school tour facility. The proposed development comprises
  • The laying out of an (undeveloped) area adjoining the distribution centre site as a school (and related group) tour open/visitor farm with a series of demonstration and grazing areas and paddocks relating to fruit & vegetable growing and animal rearing
  • The provision of 2 no. Polytunnels relating to fruit & vegetable growing and demonstration
  • The provision of a reception building (portakabin or similar type structure measuring c. 76 sqm)
  • Vehicular access to the site will be via the existing r445 roundabout spur and the laying of an access road, vehicle turning area, parking area, and connection to adjoining distribution centre site (for visitor tours and site management related movements only)
  • The provision of stock proof fencing throughout the site, and modification to site boundary treatments as required; and
  • Water supply, foul sewer (rising main and associated pumping station), electrical/utilities connections to existing networks within the adjoining distribution centre site, and all associated and ancillary works and accommodation

Key dates

Timeline

  1. Application received3 May 2022
  2. Decision due27 June 2022
  3. Decision issued24 June 2022
  4. Grant issued25 August 2022
  5. Permission expiry24 August 2032

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.