Kildare Innovation Campus (KIC), Barnhall Meadows, Leixlip
Demolition of three buildings to construct two deep tech buildings and four data centres in Leixlip.
2360047 · Kildare County Council · Lodged 18 July 2023
- Reference
- 2360047
- Authority
- Kildare County Council
- Register status
- Appealed
- Type
- PERMISSION
- Received
- 18 July 2023
Summary
AI-generatedThis major development at the Kildare Innovation Campus involves the demolition of three existing buildings totaling 84,838 sqm. It proposes the construction of two new deep tech buildings and four new data centre buildings with solar panels, green walls, and rainwater harvesting.
- Floor area
- 148,360 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Will consist of demolition of existing buildings no’s 7, 8 and 9 (total gfa c. 84,838sqm). - existing buildings no’s 1
- 6 will be retained for deep tech and innovation related uses (total gfa c. 42,862sqm) - construction of 2 no. New deep tech buildings and 4 no. New data centre buildings, all including ancillary office spaces. The deep tech buildings will have an overall maximum height of c. 16m and vary in size from30,945sqm
- 41,190sqm with a combined total gfa of c. 72,135 sqm. The data centres will be c. 15 m in height to parapet and c. 16.5m in height to top of roof plant screening. The data centres will vary in size from 13,225 sqm
- 21,000 sqm with a combined total gfa of c. 76,225sqm. All buildings will be provided with solar pv panels at roof level and green walls along selected elevations. - the new deep tech buildings (a1 & a2) will be provided with service yard areas, loading docks, car parking, access roads, security fencing/gates and landscaping. The deep tech buildings will include rainwater harvesting tanks and green roofs over office areas. - each data centre (b1, c1, c2 & c3) will include data halls, admin blocks (comprising offices, breakroom, loading dock, storage, and ancillary areas) and a variety of mechanical and electrical plant areas/structures including battery storage rooms and mechanical rooms. Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided. - b1 will include 14 no. Fuel oil generators, mv rooms and associated mechanical flues. C1 – c3 will each include 22 no. Fuel oil generators, mv rooms and associated mechanical flues (each c. 18.6m high). Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided
- 2 no. District heating pump house areas and inground piping for district heating system. - construction of a replacement 110kv gas insulated switchgear (gis) substation adjacent to the existing 110kv rinawade substation. The current air insulated switchgear (ais) substation known as the rinawade 110kv sub is fed by 2 x 110kv overhead lines. The new substation will connect to these overhead lines via short runs of underground cable. The replacement 110kv substation will include 6 no. Transformers, with client control building and a 2 storey gis substation building within a 2.4m high fenced compound. - decommissioning and removal of the existing 110kv rinawade substation. - construction of an on-site energy centre to provide to the nation
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| No. 18 Confey Court, Hereford Park, Liixlipprice excludes VAT | Aug 2025 | €396,476 | 432 m |
| 16 Confey Court, Hereford Park, Leixlipprice excludes VAT | Sept 2025 | €418,502 | 432 m |
| 19 Confey Court, Hereford Park, Leixlipprice excludes VAT | Sept 2025 | €396,476 | 432 m |
| 9 Confey Court, Hereford Park, Leixlipprice excludes VAT | Sept 2025 | €348,018 | 432 m |
| 11 Confey Court, Hereford Park, Leixlipprice excludes VAT | Sept 2025 | €348,018 | 432 m |
| 20 Confey Court, Hereford Park, Leixlipprice excludes VAT | Sept 2025 | €348,018 | 432 m |
| 12 Confet Court, Hereford Park, Leixlipprice excludes VAT | Sept 2025 | €436,123 | 432 m |
| 2 Elton Court, Leixlip, Kildare | May 2025 | €490,100 | 454 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received18 July 2023
- Decision due11 September 2023
- Decision issued7 September 2023
- Grant issued22 January 2024
- Appeal submitted3 October 2023
- Permission expiry21 January 2034
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted220 m away
For the demolition of an existing 23m2 single storey entrance porch at Building No.3 (North-East elevation)…
Kildare Innovation Centre , Barnhall Road , Leixlip
2560200KildareLodged 28 Feb 2025Commercial
- Granted260 m away
Will consist of erection of Six 3m diameter x 10m high raw material storage silos in the open yard to the…
Kildare Innovation Centre , Barnhall Road , Leixlip
23690KildareLodged 22 Jun 2023Industrial
- Awaiting decision270 m away
Erection of six 3m diameter x 10m high raw material storage siles in the open yard to the rear of buildings…
Kildare Innovation Centre , Barnhall Road , Leixlip
23450KildareLodged 28 Apr 2023Retention
- Awaiting decision290 m away
Retention permission for development specifically relates to Building No.4, retention permission consists of…
Liffey Park Technology Campus , Barnhall Rd Parsonstown , Leixlip
21270KildareLodged 5 Mar 2021Retention
- Granted310 m away
The proposed development which specifically relates to Building No. 4 located to the northeast of the centre…
Liffey Park Technology Campus , Barnhall Road , Parsonstown
21623KildareLodged 10 May 2021Retention
- Awaiting decision420 m away
The renovation, conversion, extension and change of use of existing vernacular buildings as 5 no. self…
Alensgrove , Parsonstown , Leixlip
161122KildareLodged 28 Oct 2016Retention
- Granted430 m away
Part two storey and part one storey extension comprising extended kitchen/family room to ground floor, two…
78 Celbridge Road , Leixlip , Co. Kildare W23 N2E4.
161293KildareLodged 14 Dec 2016Extension
- Awaiting decision450 m away
Refurbishment of dwelling to include demolition of sheds and removal of porch, chimney, upgrade of existing…
Back Gate Lodge , Celbridge Road , Leixlip
231053KildareLodged 20 Dec 2023Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionIndustrial
Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main…
Avoca River Park , Shelton Abbey & Kilbride , Arklow
201247WicklowLodged 8 Dec 2020
- GrantedInfrastructure
Provision of 4 new information and communications technology (ICT) Facility buildings and associated…
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22
SD20A/0309/EPSouth DublinLodged 27 Apr 2026
- GrantedEnergy
Construction of 3 no. data hall buildings with ancillary offices, staff areas, front and back of house areas,…
Former Clyde House, IDA Blanchardstown Business and Technology Park, Snugborough Road, Blanchardstown, Dublin 15
FW20A/0087/E1FingalLodged 1 Sept 2025
- Awaiting decisionIndustrial
For a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm…
Townlands of Halverstown Jigginstown and Newhall , Naas , County Kildare.
2460740KildareLodged 1 Aug 2024
- GrantedInfrastructure
To construct the following: a 24,505sqm single storey data centre building, a 5232sqm single storey Logistics…
Palmerstown Toberroe & Derrydonnell ,
211047galwayLodged 14 Jun 2021
- GrantedCommercial
MODIFICATIONS TO EXISTING 12,000SQM VACANT WAREHOUSE BUILDING TO ACCOMMODATE PROPOSED DATA CENTRE WITH…
TAWNAGHMORE UPPER , KILLALA , BALLINA
16694MayoLodged 5 Sept 2016
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.