Planning Permission Ireland
Awaiting decisionEnergy

Newtown, Ballycullane Lower and Ballycullane Upper, Co. Kildare

Development of a major solar farm spanning across Kildare and Carlow.

2660343 · Kildare County Council · Lodged 31 March 2026

Reference
2660343
Authority
Kildare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
31 March 2026

Summary

AI-generated

This application is for a solar PV farm development on a site area of approximately 126.4 hectares, with 65.1 hectares located in County Kildare. The project includes ground-mounted solar panels, 18 transformer stations, internal access tracks, and a temporary construction compound.

Energysolarrenewableinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Red iii application for a solar farm development that will consist of: (i) construction and operation solar pv panels on ground mounted steel supported structures with associated string inverters; (ii) installation of 18 no. Transformer stations at various points across the site; (iii) internal underground trenching, electrical cabling and ducting between the solar pv arrays and electrical inverters/transformers; (iv) provision of 1 no. Site entrance from the l4014 via an existing agricultural access point and provision of 1 no. Passing bay along the l4014; (v) provision of internal access tracks and watercourse/drain crossings, perimeter fencing and pole mounted cctv cameras; (vi) 1 no. Temporary construction compound; (vii) all associated site development, landscaping, drainage arrangements and ancillary works. The proposed solar farm development spans a total site area measuring c. 126.4ha, of which c. 65.1ha, the subject of this application, is located in co. Kildare and c. 61.3ha is located in co. Carlow. A separate planning application is being lodged with carlow county council. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar pv panels of the entire development including carlow and kildare is estimated to be c. 120mw. A natura impact statement (nis) has been prepared and was submitted as part of this application. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Key dates

Timeline

  1. Application received31 March 2026

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.