Awaiting decisionEnergyDecision was due 29 April 2026

in the townlands of Fyanstown, Kilmainham Rossmeen and Sedenrath, Kells

A large-scale solar farm and energy storage compound across 137 hectares near Kells.

2660267 · Meath County Council · Lodged 5 March 2026

Reference
2660267
Authority
Meath County Council
Register status
In progress
Type
PERMISSION
Received
5 March 2026

Summary

AI-generated

The development consists of approximately 462,660 square metres of ground-mounted solar panels and 41 single-storey transformer stations. It also includes an energy storage compound with 70 containerised modules, underground cabling, and a river crossing.

Energysolarbattery storageinfrastructurerenewables

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Red iii application- a solar farm and energy storage compound with a total area of circa 137 hectares. The proposed development will consist of a solar farm comprising of c. 462,660 sq. M of solar photovoltaic panels on ground mounted frames, associated string inverters mounted to rear of panels and 41 no. Single storey electrical transformer stations and 1 no. Medium voltage control/switching substation. The energy storage compound will consist of 70 no. Containerised energy storage modules and associated plant and equipment, 35 no. Transformers and 5 no. Auxiliary transformers, 2 no. Spare parts containers and
  • No. Medium voltage control/switching substation. The overall project will also consist of underground electrical ducting and cabling within the development site and within the r163 and r147 public roads, horizontal directional drill (hdd) crossing of the blackwater river, temporary construction compounds, security fencing, cctv, access tracks, landscaping, drainage and all ancillary development works and apparatus necessary to facilitate the proposed development. Construction and operational access will be via 2 no. Existing entrances from the r147 and r163 which will be upgraded. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A natura impact statement (nis) has been prepared and will be submitted to the planning authority with the application. The nis includes an assessment of the grid connection for the solar farm project comprising a 110kv electricity substation and ‘loop-in / loop-out’ grid connection cabling to the existing arvagh/navan 110kv overhead line which will be the subject of an application to an coimisiún pleanála and is situated in the townland of kilmainham, kells, co. Meath. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received5 March 2026
  2. Further information requested26 May 2026
  3. Decision due29 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.