Planning Permission Ireland
GrantedEnergyDecided 4 January 2021

Cúil Na Móna Bog, within the townland of Clonboyne and Clonkeen, Portlaoise

Develop a Renewable Gas Facility and associated infrastructure on a 17.34-hectare bog site.

19530 · Laois County Council · Lodged 19 September 2019

Reference
19530
Authority
Laois County Council
Register status
Decided
Type
PERMISSION
Received
19 September 2019

Summary

AI-generated

The proposed development consists of a Renewable Gas Facility, a peat deposition area, and road upgrades on a 17.34-hectare site. It includes digestion tanks, a reception building, an odour abatement unit, and a digestate lagoon.

Energybiogasrenewableenergyinfrastructure
Floor area
4,627 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Develop a renewable gas facility, associated peat deposition area and external and internal road upgrades at cúil na móna bog within the townland of clonboyne and clonkeen, portlaoise, co. Laois. The total area of the proposed development is 17.34 ha and consists of the following elements
  • Renewable gas facility (6.85 ha) including the following: weighbridge and weighbridge office
  • 21m2 in area 4.45m high, administration building 228m2 in area 5.1m high, reception building 2,700m2 in area 11.75m high, odour abatement unit 400m2 in area stack height 18m, tank farm
  • 2 no. Primary digestion tanks (6,500m3) 22m high; 2 no. Secondary digestion tanks (5,650m3) 17.2m high; 2 no. Buffer storage (450m3) 6m high; 4 no. Liquid feed intake tanks (100m3) 12m high; 2 no. Process water tanks (30m3) 7.5m high; 4 no. Pasteurisation tanks (30m3) 7.5m high, gas upgrade and injection plant 1,278m2, covered digestate lagoon 55,100m3 capacity, surface water attenuation pond 20m x 30m, wastewater below ground holding tank 10m3 capacity, palisade site fencing 2.4m high, 1,420m in length, on-site electrical sub-station up to 22m2, circulation yard area 3,500m2 incl. 28 no. Car parking spaces
  • Peat deposition and surrounding area (9.13ha)
  • External road upgrades including proposed new roundabout, upgrade of r445 and local access road to existing site entrance
  • 660m in length (0.91ha)
  • Internal upgrade of site access road
  • 443m in length (0.45ha). Permission is sought for a period of 10 years and is a development that is for the purpose of an activity requiring an industrial emission licence from the epa. An environmental impact assessment report (eiar) and natura impact statement (nis) has been prepared and accompanies this planning application

Key dates

Timeline

  1. Application received19 September 2019
  2. Further information requested12 November 2019
  3. Further information received19 May 2020
  4. Decision due5 January 2021
  5. Decision issued4 January 2021
  6. Appeal submitted28 January 2021
  7. Appeal decided23 May 2022
  8. Permission expiry22 May 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.