RefusedEnergyDecided 2 February 2022

Townlands as above.

Addition of four wind turbines to the Tullynamoyle wind farm in County Leitrim.

2157 · Leitrim County Council · Lodged 29 March 2021

Reference
2157
Authority
Leitrim County Council
Register status
Decided
Type
PERMISSION
Received
29 March 2021

Summary

AI-generated

A ten-year planning permission is sought for four additional wind turbines with a maximum tip height of 155 metres. The project includes crane hardstands, a substation building, and an underground grid connection to Corderry Substation.

Energywind farmrenewableinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A ten-year planning permission and a thirty- year operational life, from the date of commissioning, for an additional four (4) wind turbines to the nineteen (19) turbine tullynamoyle windfarm (15 existing turbines and 4 consented turbines) in the townlands of tullinloughan, lackagh, tullynamoyle and gowlaun, county leitrim. An underground grid connection to corderry substation will be located in the townlands of tullinwannia, tullynasharragh, gubaderry, tullinwillin, gortahork, mullaghmore, leamaskally, cornmarve, drumlumman glebe, drumillion, drumany glebe, belhavel, corrasra and corderry, killarga, county leitrim. The proposed development will constitute the provision of the following
  • The construction of four (4) wind turbines with maximum hub heights of 92 metres and maximum overall heights of 155 metres to blade tip
  • The construction of crane hardstand areas located beside each turbine
  • The construction of one (1) 20kv substation building, 2 no. Container units and associated electrical plant for grid stabilisation
  • Internal windfarm underground cabling including one stream-crossing by overhead line
  • The construction of new site access tracks and the provision of upgraded access roads
  • Installation of a drainage system for the proposed hardstand and road areas
  • Underground grid connection to corderry 110kv substation, approximately 9.5km in length, along the existing public road network
  • All associated site development and ancillary works. The planning application will be accompanied by an environmental impact assessment report (eiar) and by a natura impact statement

Key dates

Timeline

  1. Application received29 March 2021
  2. Further information requested21 May 2021
  3. Further information received1 December 2021
  4. Decision due3 February 2022
  5. Decision issued2 February 2022
  6. Appeal submitted1 March 2022
  7. Appeal decided29 August 2023
  8. Permission expiry28 August 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.