GrantedIndustrialDecided 11 February 2026

Nure townland, Lurganboy, Co. Leitrim

Continued use and expansion of a quarry and concrete plant in Lurganboy.

2560303 · Leitrim County Council · Lodged 11 December 2025

Reference
2560303
Authority
Leitrim County Council
Register status
Decided
Type
PERMISSION
Received
11 December 2025

Summary

AI-generated

The application seeks the continued use and lateral extension of an existing 3.4ha quarry, including extraction over a new 2ha area. It also includes the continued use of a pre-cast concrete manufacturing facility and the construction of two new industrial buildings.

Industrialquarryindustrialconcrete plant
Floor area
1,680 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The proposed development will consist of the following
  • Continued use of the existing operational quarry (3.4ha) (granted under plan file ref. No. 20140)
  • Recommencement of extraction of a partially extracted area previously authorised under su0057 (3.9 ha) to a final floor level of 148 mod
  • Recommencement of use for stockpiling of the remainder of the historic quarry floor (2.9 ha) previously authorised under plan ref. Su0057.4) lateral extension of the existing quarry including extraction of rock and all associated facilities/works over an area of c. 2 ha to a final floor level of 148 mod
  • The continuation of use of an existing pre-cast concrete manufacturing building, concrete batching plant, machine storage building and existing yard area (granted under plan file ref. No. 21251)
  • Continuation of use of the existing settlement lagoons granted under plan file ref. No. 20140.7) construction of two new buildings: - building 1 (1,595 m2): a shed to enclose the existing pre-stressed beds/moulds, complete with a store. - building 2 (85 m2): incorporating a store for two items of equipment associated with block making, compressor house, and substation with switch room for 3-phase supply, to be located adjacent to the existing ready-mix plant
  • Importation of sand for use in concrete manufacturing
  • Import approx. 70,000m3 (c. 125,000 tonnes) of article 27 clean, uncontaminated soil and stone byproduct (a non-eia scheduled activity that does not require waste authorisation), to construct a screening berm to the south of the extraction area and to restore part of the application area following the completion of extraction
  • All related ancillary development and associated site facilities/works including processing (crushing, screening and washing) and stockpiling of materials; workshop, site office, block yard, and all other related activities. The proposed development is within an overall application area of c. 20 hectares and is for a total period of 25 years, with an additional 2 years for final site restoration

Key dates

Timeline

  1. Application received11 December 2025
  2. Decision due13 February 2026
  3. Decision issued11 February 2026
  4. Grant issued16 March 2026
  5. Permission expiry15 March 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.