Ballynilard, Tipperary, Co. Tipperary
Construction of an anaerobic digestion facility to produce biomethane and fertiliser in Tipperary.
2660031 · Tipperary County Council · Lodged 19 January 2026
- Reference
- 2660031
- Authority
- Tipperary County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 19 January 2026
Summary
AI-generatedThe proposed development comprises an anaerobic digestion facility with a gross floor area of approximately 3,301 sq.m. It will feature three digesters, digestate storage structures, pasteurisation tanks, and a part single-storey, part two-storey reception hall.
- Floor area
- 3,301 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Red iii application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, co2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq. M. The development will consist of the following
- 3 no. Digesters (all c. 15.5m in height), 2 no. Digestate storage structures (c. 15.5m and c. 12m in height), a liquid feed tank (c. 4m in height) and a pump room and o2 generation structure (with a gfa of c. 27 sq. M. And a height of c. 2.6m), located in the northern section of the site
- 4 no. Pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height) and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters
- A part single-storey and part two-storey reception hall (with a gross floor area (gfa) of c. 1,964 sq. M. And an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located to the centre of the site
- Two pump house structures, each with a height of c. 2.6m and gfas of 14 sq. M. And 21 sq. M. , will be provided to the west and east of the reception hall building respectively
- A single-storey solid digestate storage and a nutrient recovery building (with a gfa of c. 880 sq. M and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site
- Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building
- Construction of an esb substation (with a gfa of c. 27 sq. M and a height of c. 3.4m), a grid injection unit (with a gfa of c. 22 sq. M and a height of c. 2.8m) (which will be connected to the gas grid by way of an underground connection by gas networks ireland), a gni / grid offtake skid, and a fire water storage tank (with a height of c. 7.7m) in the southern portion of the site
- Construction of 2 no. Co2 tanks (c. 10.7m in height), a co2 loading pump (c. 2.6m in height), co2 auxiliaries (c. 2.6m in height), co2 liqueufactor (with an overall height of c. 8.2m), a co2 compressor (with an overall height of c. 5.9m) and a co2 pre-treatment skid (c. 3.5m in height), located in the we
Key dates
Timeline
- Application received19 January 2026
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decision
RED III development which will consist of planning permission for a period of 10 years for the construction…
Thornhill and Annaholty , Birdhill , Co. Tipperary
2660621TipperaryLodged 25 Jun 2026
- Awaiting decisionEnergy
RED III a period of 10 years for the construction and operation of a biogas renewable energy facility…
Thornhill and Annaholty , Birdhill , Co Tipperary
2561056TipperaryLodged 21 Oct 2025
- RefusedEnergy
The construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Cappanihane , Bruree , Co. Limerick
2560239LimerickLodged 24 Mar 2025
- RefusedEnergy
For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Ballyvass , Castledermot , Co. Kildare
2560920KildareLodged 12 Aug 2025
- Awaiting decisionEnergy
A period of 10 years for the construction and operation of a biogas renewable energy facility comprising of 2…
Thornhill and Annaholty , Birdhill , Co Tipperary
2560984TipperaryLodged 2 Oct 2025
- GrantedEnergy
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as…
Inchera Little Island Co.Cork
25/5034corkLodged 3 Jun 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.