Planning Permission Ireland
GrantedCommercialDecided 23 September 2025

University Hospital Limerick, St. Nessan's Road Dooradoyle, Limerick

A third-floor hospital extension for 16 beds, new lifts, and parking.

2560751 · Limerick County Council · Lodged 31 July 2025

Reference
2560751
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
31 July 2025

Summary

AI-generated

The project includes a third-floor extension at University Hospital Limerick for 16 acute inpatient beds, a link corridor, and two 4-storey evacuation lifts. Retention is also sought for an extended plantroom, while no works are proposed to the nearby protected chapel.

Commercialhospitalextensionprotected structure
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of the 3rd floor extension comprising of 16no. Acute inpatient bed spaces with associated clinical and support accommodation including a link corridor at the 3rd floor level connecting the new medical ward with the southern stairwell. The works will also include a vertical ex-tension of existing southern and northern stairwell adjoining the hospital street; a construction of 2no. 4-storey high evacuation lifts with associated protected lobby at each level, as well as provision of additional 16no car parking spaces. Retention permission is also sought for the extended plantroom at 2nd floor of existing acute inpatient ward. The hospital chapel within the hospital campus is a protected structure (rps. Reg. 1649). No works are proposed to the protected structure as part of this application

Land-use zoning

What this land is zoned for

Education and Community FacilitiesCI
To protect and provide for educational, training and adult learning, community, healthcare, childcare, civic, religious and social infrastructure.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
23 Oakvale Dr, Dooradoyle, LimerickApr 2025€630,000130 m
22 Oakvale Dr, Dooradoyle, LimerickJul 2025€333,000144 m
28 Oakvale Dr, Dooradoyle, LimerickFeb 2025€150,000157 m
8 Oakvale Drive, Dooradoyle, LimerickMay 2025€390,000237 m
4 Willsbrook, St Nessans Rd, DooradoyleJan 2026€300,000246 m
22 Willsbrook, Dooradoyle, LimerickJun 2026€463,000252 m
26 Carrig Dr, Dooradoyle, LimerickMar 2026€375,000266 m
7 Belvoir Estate, High Meadows, GouldavoherMay 2025€370,000270 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 July 2025
  2. Decision due24 September 2025
  3. Decision issued23 September 2025
  4. Grant issued28 October 2025
  5. Permission expiry27 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.