GrantedInfrastructureDecided 5 May 2022

Glebe, Ardee, Co Louth

Realignment of 4.5km of the N52 road near Ardee, including new roundabouts and junctions.

211482 · Louth County Council · Lodged 14 December 2021

Reference
211482
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
14 December 2021

Summary

AI-generated

Louth County Council intends to realign 4.5km of the N52 National Secondary Route. The project will feature a single carriageway road, a new multi-lane roundabout at the N2 junction, a single-lane roundabout, and a shared footway and cycleway facility.

Infrastructureroadinfrastructurecouncil

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Part 8 - louth county council hereby gives notice of it's intention to carry out the following development: realignment of the n52 national secondary route in the townlands of mandistown, co meath, ballygowan, bohernamoe, townparks, mullanstown and glebe in county louth, comprising the construction of a single carriageway road for a distance of 4.5km from a location 150m north of the n33/n2/r171 roundabout junction on the n2 in the townland of glebe. The n52 realignment will typically consist of a 7.0m wide carriageway with 2 x 0.5m hard strips and a 2.5m wide verge. Where a footway/cycleway is provided, the verge will be widended to 5.0m to accommodate a 3.0m shared footway/cycleway facility on one side of the road. Ghost island junctions will be located at the l-5234 silverhill road staggered t junction, the l-5232 townparks road staggered t junction and the l-1233 mullanstown road t junction north, with the southern arm of the mullanstown road stopped up. A new multi-lane roundabout is provided at the junction with the n2 in the townland of glebe. The l-5234 silverhill road is realigned for 500m and a new single lane roundabout is provided at the junction with the existing n52. South of the silverhill road roundabout, the existing n52 will be reclassified as a local road and stopped up south of burley bridge. Localised realignment of the silverhill road, townparks road and mullanstown road (north) is required to connect them to the proposed n52 ardee bypass. Two new bridge crossings, each with an approximate span of 30m are provided at the river dee and river garra, with monir watercourses cuverted under the proposed road. The remaining works will consist of earthworks, pavement works, attenuation features, the connecton of road/land drainage outfalls ot the new sustainable urban drainage system (suds) network, completion of landscaping and accommodation works, implementation of environment measures and all other ancillary works. Full plans and particulars are available at www. Louthcoco. Ie

Key dates

Timeline

  1. Application received14 December 2021
  2. Decision due12 May 2022
  3. Decision issued5 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.