Planning Permission Ireland
GrantedInfrastructureDecided 4 March 2024

between the towns of Swinford and Foxford located in County Mayo: located in the townlands of Carrowkeribly Bunnafinglas DrumscobaCorradrishy Boherhallagh Coolagagh CuillonaghtanCallow, Barleyhill Bohola Toocananagh Ballinlag Gortnasillagh Coolagh C

Installation of approximately 7km of interconnecting water main and replacement of over 12km of existing mains.

2360353 · Mayo County Council · Lodged 4 September 2023

Reference
2360353
Authority
Mayo County Council
Register status
Decided
Type
PERMISSION
Received
4 September 2023

Summary

AI-generated

The development involves installing a 7km interconnecting main from Callow Lake to the Attymass GWS to amalgamate both schemes. It also includes replacing 12,765m of existing mains and carrying out associated temporary site works.

Infrastructurewaterinfrastructurepipeline

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of
  • Installation of approx. 7km interconnecting main, and associated valves & fittings, from the source at callow lake to the attymass gws to amalgamate both schemes. This involves the installation of a 160mm od pe pipe along the n26 for 2km and along church rd. For a further 5km. The main will be installed in the south verge of the n26(1.8km) and will be laid in a combination of field (2.7km), road(1.8km), road verge(0.3km), and setback(0.12km) along church rd
  • Replacement of 12,765m of existing mains and installation of associated valves & fittings. Of which 2,971m is located in attymass gws and 9793m is located in callow lake gws. Mains to be installed vary in size from 63mm od to 110mm od and will be installed in field (8622m), road(2082m), road verge(1201m), setback(390m) and footpath(469m)
  • All associated temporary site development works to gain access including clearance of vegetation, disassembly and reassembly of gate posts/ piers and removal and reinstatement of existing fencing, walls, and hedging
  • Other temporary associated and ancillary development works required for the purposes of the proposed works, including the installation of stone tracks and temporary watercourse crossings. The proposed attymass gws watermain upgrade works are located in the townlands of carrowkeribly, bunnafinglas, and drumscoba. The proposed interconnector pipelines works are located in the townlands of corradrishy, boherhallagh, coolagagh, cuillonaghtan, and callow. The proposed callow gws watermain upgrade works are located in the townlands of barleyhill, bohola, toocananagh, ballinlag, gortnasillagh, coolagh, carrowmore, ballinvoher, lislackagh, lissanumera, tullanacorra, carrowbaun, rathslevin, tooromin, carrowcanada, lismiraun, treanfohanaun, and shanaghy in county mayo

Key dates

Timeline

  1. Application received4 September 2023
  2. Further information requested25 October 2023
  3. Further information received16 January 2024
  4. Decision due11 March 2024
  5. Decision issued4 March 2024
  6. Grant issued4 April 2024
  7. Permission expiry3 April 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.