GrantedInfrastructureDecided 17 April 2023

Woodland, Batterstown, Co. Meath

Expansion of the Woodland electrical substation in Batterstown, including a 4-hectare hardstand extension and new electrical apparatus.

221550 · Meath County Council · Lodged 30 November 2022

Reference
221550
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
30 November 2022

Summary

AI-generated

The development consists of installing outdoor Air Insulated Switchgear electrical apparatus and extending the hardstand compound by approximately 4 hectares. It includes extending the existing 400 kV busbar, erecting four 45-metre-high lightning masts, constructing an 80 sqm extension to the control building, and installing new cable links.

Infrastructuresubstationgridinfrastructure
Storey
1
Floor area
80 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of
  • Installation of outdoor air insulated switchgear (ais) electrical apparatus, including an associated extension to the hardstand compound (approximately 4 hectares) to facilitate same. This includes: a. Installation of an extension to both sides of the existing 400 kv busbar, with provision of an associated wing coupler at either end of the existing 400 kv busbar. B. Additional apparatus and associated works to the two existing busbars to create what is known as sectionalising bays. C. Relocation of existing transformer connections from existing busbar to adjacent location on new busbar. D. An associated single-story extension (approximately 80 m2) to the existing control building
  • The erection of four new lightning masts and relocation of one existing mast (each approximately 45m high)
  • Two bays on opposite sides to the newly extended 400 kv busbars at the southern end of the substation, each bay to incorporate breakers, reactive compensation devices and cable sealing ends. These bays will facilitate the connection of the new 400 kv underground cable links from dunstown and belcamp substations respectively
  • Renewal, alteration and/or removal of associated 400 / 220 kv electrical apparatus and equipment
  • All ancillary site development works including site preparation works, site clearance and levelling; provision of hardstanding, internal access tracks and temporary construction compound; associated underground cabling and earthgrid; associated extended surface water drainage network including a soakaway; associated palisade fencing and gates (approximately 2.65m high); lighting poles and landscaping as required to facilitate the development. Planning permission is sought for a period of 10 years. Significant further information/revised plans submitted on this application

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received30 November 2022
  2. Further information requested1 February 2023
  3. Further information received27 February 2023
  4. Decision due18 April 2023
  5. Decision issued17 April 2023
  6. Grant issued25 May 2023
  7. Permission expiry24 May 2028

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.