Planning Permission Ireland
GrantedInfrastructureDecided 6 October 2017

Staleen, Donore, Co. Meath

Renovation of the masonry lock chamber and installation of new lock gates at Staleen Lower.

LB170951 · Meath County Council · Lodged 16 August 2017

Reference
LB170951
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
16 August 2017

Summary

AI-generated

The project involves permanent renovation works to the existing masonry lock chamber at Staleen Lower, Donore, including new timber and steel lock gates. Works also include temporary dams, dredging of silt, repair of a 100-metre wash wall, and a temporary site compound.

Infrastructurecanalinfrastructureheritagecivil works

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Project works will include permanent renovation works to existing masonry lock chamber at staleen lower and the provision of new timber and steel lock gates at each end of the lock. The works will include enabling works to facilitate access to and a working platform for machinery at the lock, the construction of temporary timber stop-board dams and the pumping of standing water and dredging of accumulated silt from the bed of the lock. This silt will be stored and dried out on site, in a lined bunded storage area, adjacent to the north side of the lock. The works will also include the repair and re-pointing of the 100 metre long masonry wash wall to the west of the lock. Altogether the permanent renovation works at the lock and wash wall will extend over a length of about 150 metres. The temporary and enabling works will extend further westwards to the site compound. The projects includes for the provision of a temporary site compound on the south side of the canal that will have access via a private road to the l1601 donore-slane road to facilitate site traffic. Machine and construction access from the site compound to the staleen lock will be via a temporary earthen causeway, constructed across the canal at a point about 260 metres to the east of fullam's bridge, and then eastwards across privately owned lands. An appropriate assessment environmental screening and natura impact statement (nis) report was prepared for the project by dr. Patrick moran of forest environmental research and services, fers ltd, in compliance with appropriate assessment of plans and projects in ireland - guidance for planning authorities (doehlg 2011). A habitat map, plant species list, bat survey and archaeological assessment have also been prepared. These are all included in the planning application documentation

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received16 August 2017
  2. Decision due10 October 2017
  3. Decision issued6 October 2017
  4. Grant issued10 November 2017
  5. Permission expiry9 November 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.