Causetown, Stackallen, Navan Co Meath
Amendments to an approved 100MW energy storage facility, including increasing the number of battery containers.
LB201276 · Meath County Council · Lodged 15 September 2020
- Reference
- LB201276
- Authority
- Meath County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 15 September 2020
Summary
AI-generatedThe application seeks to amend the design of an approved energy storage facility on a 2.8-hectare site. Proposed changes include developing in two phases up to 100MW, extending the permission life from 5 to 10 years, altering construction hours, and increasing the number of battery containers from 24 to 33.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- The development will consist of permission to amend the design of the approved development (planning reference: lb171475) for an energy storage facility to provide services to the national grid system on the 2.8ha site, comprising battery containers, combined power conversion system and transformer units, associated electrical infrastructure, fencing, access track, cctv, ecologically beneficial landscaping, and associated ancillary development on lands in causestown, stackallen, navan, co. Meath. , subject to 17 conditions. Amendments proposed are: - two phases of development, proposed with the combined capacity of no more than 100mw. - increase the life of the permission from 5 to 10 years to facilities phase
- Amend condition 11 of parent consent (planning ref: lb171475) to specify that any remedial road works if required as a result of the development shall be focused on the l3411 from entrance a to n51 junction. - amend condition 12 of parent consent (planning ref: lb171475) to allow for construction works to be carried out between 0700 and 1900 monday to friday and 0800 and 1600 on saturday. - increase from 24 to 33 smaller battery containers. 31 of which are orientated in a northwest to southeast direction, with the other two in the southeast corner oriented in an east-northeast to west-southwest direction. - change from 24 large combined power conversion system (pcs) and transformer units to 40 much smaller individual pcs and transformer units. These will no longer be housed in containers but are externally mounted. - addition of four low voltage (lv) cabinets. - revised layout and size of the grid connection and compliance equipment within the storage area: - change from a 500m3 underground surface water storage tank to a surface water storage pond, with stock proof fence and gate; - spare parts container moved from the east to the southwest corner of the esf compound; - additional small section of temporary access track and cable trench in west corner for grid related works; - increase in length of the modular substation within the esf. - removal of grid transformer off site to be relocated within the associated grid connection infrastructure (subject to separate planning application). - addition of 2no. Cctv cameras (a total of 7no. Cctv cameras within the site). - addition of 5 security light columns
Land-use zoning
What this land is zoned for
“Rural Area”
National zoning type: Mixed/general primary sector uses, including 'rural'
Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received15 September 2020
- Further information received7 December 2020
- Decision due12 January 2021
- Decision issued11 January 2021
- Grant issued23 February 2021
- Permission expiry5 December 2028
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision30 m away
To amend the design of the approved development (Planning Ref:lb171475) which comprises of consent for an…
Lands at Causetown , Stackallen , Co Meath
LB201174MeathLodged 28 Aug 2020Energy
- Awaiting decision100 m away
The construction of a new bay within the existing Gorman substation, a remote substation compound with 2 CCTV…
Lands at Causetown , Stackallen , Co Meath
LB201175MeathLodged 28 Aug 2020Infrastructure
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The proposed development constitutes a new battery energy storage facility & synchronous condenser, with…
Creemore & Belshamstown , Batterstown , Co. Meath
22837MeathLodged 27 Jun 2022
- Awaiting decisionEnergy
A 10 year planning permission on a site of approximately 4.9 hectares is sought. The development will consist…
Derrynagall or Ballydaly , Tullamore , Co. Offaly
2660248OffalyLodged 5 May 2026
- GrantedEnergy
The development will consist of a c. 30 MW capacity battery storage facility within a secured compound and…
ESB lands, south of Kylemore Way, and north west of the existing ESB Networks premises, Kylemore Way, Dublin 8
4282/19Dublin CityLodged 23 Oct 2019
- GrantedEnergy
The development will consist of 10 year planning permission for the construction of a — enclosed battery…
Silloge , Navan , Co. Meath
2360508MeathLodged 21 Dec 2023
- GrantedEnergy
Permission to consist of alterations to the development of a Battery Storage Facility which was previously…
Lisdrumdoagh , Rackwallace , Monaghan
20373MonaghanLodged 16 Sept 2020
- GrantedEnergy
A development that will consist of amending the existing consented granted application (Planning Reference:…
Horsepasture , Clonmel , Co. Tipperary
2360997TipperaryLodged 15 Dec 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.