Planning Permission Ireland
Awaiting decisionEnergy

this site of approx. 8.8 ha in the townlands of, Maghernakelly Drumcall, and Drumgole

A 10-year permission for a renewable biogas plant processing poultry manure and organic materials in Monaghan.

2560496 · Monaghan County Council · Lodged 10 December 2025

Reference
2560496
Authority
Monaghan County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
10 December 2025

Summary

AI-generated

The development consists of a renewable biogas plant on a 6.2-hectare site to generate biogas from 99,000 tonnes of poultry manure and organic materials annually. It will feature a main process building, digestate dryer, pellet storage, a combined heat and power building, and a 40-metre-high dispersion stack.

Energybiogasrenewablepoultry manureenergy

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for proposed development which will consist of : i. A 10-year permission for a renewable biogas plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the r189 road and south of the l2280 road, on lands in the townlands of maghernakelly and drumcall, co. Monaghan. The proposed plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) buildings and associated structures: administration building (432sq. M gfa and approx. 5.94m high (h); main process building (9,104sq. M gfa and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; digestate dryer building (972sq. M gfa and approx. 16.54m h); pellet storage & distribution building (875sq. M gfa and approx. 12.34m h); a combined heat and power building (368.5sq. M gfa and approx. 10.01m h); control building (183.1sq. M gfa and approx. 5.57m h); containerised boiler (approx. 5.44m h); a combined dryer/boiler/chp dispersion stack approx. 20m h); and a plant room (22sq. M gfa and approx. 4.75m h). (b) bunded tank farm: including a digestate treatment plant (approx. 20m h); 6 no. Digester tanks (approx. 27.86m h); a sludge buffer tank (approx. 18.1m h); an evaporator feed tank (approx. 12.1m h); a condensate tank (approx. 10.6m h); a concentrate tank (approx. 10.6m h); a hot water tank (approx. 5.6m h); 2 no. Ammonia strippers (approx. 9m h); 2 no. Desulphurisation units (approx. 14m h); 2 no. Activated carbon units (approx. 5m h); a gas holder (approx. 10.65m h) with 4 no. Approx. 13m high lightning rods. (c) a co2 liquefaction plant (approx. 14.6m h); a biogas upgrade plant (approx. 10.85m h); 4 no. Fan coolers (approx. 2.2m h); a flare unit (approx. 10.1m h); a fuel storage tank (approx. 1.85m h); a gas grid entry unit (approx. 5.1m h); a firewater tank (approx. 10.1m h); 3 no. Lpg tanks (approx. 3.8m h); 5 no. Feedstock storage tanks (approx. 9.5m h); an undergrounded water tank; a backup generator (approx. 2.6m h). (d) provision of 35 car parking spaces and a covered cycle parking area. (e) a new vehicular access to the biogas facility from the northern site boundary, connecting to the l2280, designed to provide safe and efficient access for all vehicle types. (f) local road improvement works to the l2280, .... Cont

Key dates

Timeline

  1. Application received10 December 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.