this site of approximately 8.8 hectares in the townlands of Maghernakelly Drumcall and Drumgole, Drum, Co. Monaghan

A 10-year permission for a renewable biogas plant in Drum.

2660018 · Monaghan County Council · Lodged 28 January 2026

Reference
2660018
Authority
Monaghan County Council
Register status
In progress
Type
PERMISSION
Received
28 January 2026

Summary

AI-generated

The proposed development consists of a renewable biogas plant on an 8.8-hectare site to generate biogas from poultry manure and other organic materials. The facility will include an administration building, a main process building with a 40m stack, and other processing structures.

Energybiogasrenewablepoultryindustrial
Floor area
11,933 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the proposed development consisting of : i. A 10-year permission for a renewable biogas plant and associated road improvements, on a site of approximately 6.2 hectares located immediately west of the r189 road and south of the l2280 road, on lands in the townlands of maghernakelly and drumcall, co. Monaghan. The proposed plant will generate renewable biogas from 99,000 tonnes per annum of poultry manure, along with other biodegradable agricultural and agri-food organic materials, utilising anaerobic digestion technology. The development will consist of: (a) buildings and associated structures: administration building (432sq. M gfa and approx. 5.94m high (h); main process building (9,104sq. M gfa and approx. 12.58m-14.91m h) with odour control system and associated dispersion stack approx. 40m h; digestate dryer building (972sq. M gfa and approx. 16.54m h); pellet storage & distribution building (875sq. M gfa and approx. 12.34m h); a combined heat and power building (368.5sq. M gfa and approx. 10.01m h); control building (183.1sq. M gfa and approx. 5.57m h); containerised boiler (approx. 5.44m h); a combined dryer/boiler/chp dispersion stack approx. 20m h); and a plant room (22sq. M gfa and approx. 4.75m h). (b) bunded tank farm: including a digestate treatment plant (approx. 20m h); 6 no. Digester tanks (approx. 27.86m h); a sludge buffer tank (approx. 18.1m h); an evaporator feed tank (approx. 12.1m h); a condensate tank (approx. 10.6m h); a concentrate tank (approx. 10.6m h); a hot water tank (approx. 5.6m h); 2 no. Ammonia strippers (approx. 9m h); 2 no. Desulphurisation units (approx. 14m h); 2 no. Activated carbon units (approx. 5m h); a gas holder (approx. 10.65m h) with 4 no. Approx. 13m high lightning rods. (c) a co2 liquefaction plant (approx. 14.6m h); a biogas upgrade plant (approx. 10.85m h); 4 no. Fan coolers (approx. 2.2m h); a flare unit (approx. 10.1m h); a fuel storage tank (approx. 1.85m h); a gas grid entry unit (approx. 5.1m h); a firewater tank (approx. 10.1m h); 3 no. Lpg tanks (approx. 3.8m h); 5 no. Feedstock storage tanks (approx. 9.5m h); an undergrounded water tank; a backup generator (approx. 2.6m h). (d) provision of 35 car parking spaces and a covered cycle parking area. (e) a new vehicular access to the biogas facility from the northern site boundary, connecting to the l2280, designed to provide safe and efficient access for all vehicle types. (f) local road improvement works to the l2280, (continued on

Key dates

Timeline

  1. Application received28 January 2026
  2. Further information requested24 March 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.