MOANVANE BALLYKEAN BOGTOWN ENAGHAN KILCOONEY BALLYCHRISTAL AND KILCAPPAGH, CO. OFFALY
Development of a wind farm with up to 12 wind turbines and associated infrastructure across multiple townlands in Co. Offaly.
17322 · Offaly County Council · Lodged 30 August 2017
- Reference
- 17322
- Authority
- Offaly County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 30 August 2017
Summary
AI-generatedPermission is sought for a 10-year period to construct a wind farm featuring up to 12 wind turbines with a tip height of up to 169 meters. The project includes an electrical substation, a recreational amenity trail, a borrow pit, and road modifications, supported by an EIAR and NIS.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Up to 12 no. Wind turbines with a tip height of up to 169 meters and all associated foundations and hardstanding areas; a recreational amenity trail, associated signage, parking and recreational facilities; 1 no. On-site electrical substation; 1 no. Temporary construction compound; all associated underground electrical and communications cabling connecting the turbines to the proposed on-site electrical substation; provision of new site access tracks and upgrading of existing access tracks and associate drainage; excavation of 1 no. Borrow pit; works to facilitate the delivery of turbines along the local road l1013 within the townland of ballychristal to include temporary alterations to roadside boundary and the laying of temporary surfacing and the permanent setback of a roadside boundary wall; tree felling and all associated site development works. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. An environmental impact assessment report (eiar)/environmental impact statement (eis) and a natura impact statement (nis) have been prepared in respect of the proposed development
Key dates
Timeline
- Application received30 August 2017
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
UP TO 12 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 169 METERS AND ALL ASSOCIATED FOUNDATIONS AND…
MOANVANE BALLYKEAN BOGTOWN ENAGHAN KILCOONEY BALLYCHRISTAL AND KILCAPPAGH CO. OFFALY ,
17335OffalyLodged 7 Sept 2017
- RefusedEnergy
A TEN YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30 YEAR OPERATIONAL LIFE (FROM THE DATE OF…
MOMEEN & LETTERGULL , CO. DONEGAL
1850156DonegalLodged 7 Feb 2018
- GrantedEnergy
(1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT WITH 3 NO. 4.5 MEGAWATT…
MEENDERRYGAMPH , GWEEDORE , CO. DONEGAL
2250813DonegalLodged 11 May 2022
- RefusedEnergy
A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674…
BALLYKILLEEN SHEAN KILCUMBER CLONCANT & CUSHALING , EDENDERRY , CO OFFALY
19606OffalyLodged 19 Dec 2019
- RefusedEnergy
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE…
MASSLOUGHDERRYDUFF LACKAGHATERMON , ARDARA , DONEGAL PO
2251393DonegalLodged 19 Aug 2022
- RefusedEnergy
FOR TEN YEARS FOR THE DEVELOPMENT OF A WINDFARM CONSISTING OF: 14 NO. WIND TURBINES WITH A ROTOR DIAMETER OF…
REANASUPLISHEENKNOCKNAGEEHA , REABOY BARNA , BALLYNAHULLA TOOREENGARRIV
17300KerryLodged 5 Apr 2017
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.