MOMEEN & LETTERGULL, CO. DONEGAL
A 10-year planning permission for a 6-turbine wind farm with a 30-year operational life in Momeen & Lettergull.
1850156 · Donegal County Council · Lodged 7 February 2018
- Reference
- 1850156
- Authority
- Donegal County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 7 February 2018
Summary
AI-generatedThe proposed wind farm will consist of up to 6 wind turbines with a tip height of up to 135 metres. The development includes a borrow pit, a 100-metre anemometry mast, an electrical substation compound, a temporary construction compound, and amenity trails.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A ten year planning permission for a wind farm with a 30 year operational life (from the date of commissioning of the entire wind farm) and all associated works. The proposed development will consist of the following: up to 6 no. Wind turbines with an overall blade tip height of up 135 metres and all associated foundations and hard-standing areas, 1 no. Borrow pit, 1 no. Permanent anemometry mast up to a height of 100 metres, upgrade of existing and provision of new site access roads and associated drainage, 1 no. Electrical substation compound, which will have 1 no. Control building, associated electrical plant and equipment, and a waste water holding tank. 1 no. Temporary construction compound, all associated underground electrical and communications cabling connecting the turbines to the proposed on-site substation, as well as on-site underground cabling to facilitate electrical connection to the national grid, and all associated site development works, including amenity trails on wind farm roads, car parking, seating/benches and signage. An environmental impact assessment report (eiar) and a natura impact statement (nis) have been prepared in respect of the proposed development
Key dates
Timeline
- Application received7 February 2018
- Decision due27 February 2019
- Decision issued20 May 2019
- Appeal submitted14 June 2019
- Appeal decided23 July 2020
- Permission expiry22 July 2030
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
(1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT WITH 3 NO. 4.5 MEGAWATT…
MEENDERRYGAMPH , GWEEDORE , CO. DONEGAL
2250813DonegalLodged 11 May 2022
- RefusedEnergy
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE…
MASSLOUGHDERRYDUFF LACKAGHATERMON , ARDARA , DONEGAL PO
2251393DonegalLodged 19 Aug 2022
- RefusedEnergy
A TEN-YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30-YEAR OPERATIONAL LIFE (FROM THE DATE OF…
BEHY , CASHELARD , TULLYHORKY AND DOOBALLY
1851741DonegalLodged 15 Nov 2018
- RefusedEnergy
40 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF…
SHANNAGH & COGUISH , KILCAR
2151263DonegalLodged 24 Jun 2021
- Awaiting decisionEnergy
10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND…
CROAGHNASHALLOG , DONEGAL PO , CO. DONEGAL
2561652DonegalLodged 24 Sept 2025
- RefusedEnergy
Permission to develop a wind farm and associated works . The proposed development will consist of —…
Rossacurra Cranemore Kilbrannish North Bealalaw Raheenliegh Aclare Co. Carlow ,
2113CarlowLodged 22 Jan 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.