STONESTOWN KILCAMIN CRANCREAGH DERRINLOUGH AND BALLINAHOWN, CO OFFALY

Amendments to a permitted wind farm in Offaly, including increasing turbine heights to 169 metres.

19379 · Offaly County Council · Lodged 29 July 2019

Reference
19379
Authority
Offaly County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
29 July 2019

Summary

AI-generated

Ten-year planning permission is sought for amendments to a permitted wind farm development. The changes include increasing the overall wind turbine height from 150m to up to 169m, re-siting six turbines by up to 19m, realigning access tracks and cabling, and increasing the meteorological mast height to 100.5m.

Energywind energyrenewablesinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Ten year planning permission for amendments to the development permitted under an bord pleanala reference pl19.244053 (offaly county council planning register reference pl2/14/188) to provide (i) an increase in the overall wind turbine height from 150 metres to up to 169 metres; (ii) the re-siting of wind turbines t1, t2, t4, t6, t7 and t9 and their associated foundations and crane hardstandings by up to 19 metres; (iii) the realignment of wind farm access tracks including the provision of turning heads and passing bays and the associated realignment of underground wind farm electrical cabling; (iv) an increase in the maximum height of the meteorological mast to up to 100.5 metres; and (v) all associated site development, access and reinstatement works. This planning application is accompanied by an environmental impact assessment report/environmental impact statement which includes an assessment of the likely impacts of the proposed development, as a whole and in combination with the relevant off-site or secondary developments which will occur as a direct result of the proposed development, including the wind farm development permitted pursuant to offaly county council planning register reference 14/188 & an bord pleanala reference pl19.244053 and the proposed grid connection proposed pursuant to offaly county council planning register reference 18/230 & an bord pleanala reference abp-304056-19. This planning application is also accompanied by an appropriate assessment screening report.

Key dates

Timeline

  1. Application received29 July 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.