COOLCOR, RHODE, CO. OFFALY
Construction of a biomass gasification plant with carbon capture technology on a 2.45-hectare site in Rhode.
20210 · Offaly County Council · Lodged 5 June 2020
- Reference
- 20210
- Authority
- Offaly County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 5 June 2020
Summary
AI-generatedThe development will feature a combined heat and power generating biomass gasification plant to provide renewable energy and grid support. It includes feedstock reception bunkers, an office building, a gasification plant, a methanation unit, thermal energy storage tanks, and a gas engine compound.
- Floor area
- 3,436 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Development of a combined heat and power generating biomass gasification plant with integrated carbon capture and utilisation technology to provide renwable energy and electrical grid support services on a 2.45-hectare site. The development will comprise: (i) open area feedstock reception bunkers (gross area of 425.58sqm), which will provide for the intake and temporary storage of biomass material for gasification, (ii) office, welfare and control room building (gross area of 110.90sqm and 5.145m), (iii) gasification plant (gross area of 1,178sqm and height of 20.87m)) which will convert biomass into synthetic gas (syngas), (iv) gasification control building (gross area of 36.97sqm and height of 3.05m), (v) methanation unit (gross area of 429sqm and height of 12.83m) which will convert syngas into renewable gas (rng), (vi) rng filling area (gross area of 451.63sqm), (vii) 2no. Bunded thermal energy storage tanks (gross area of 78.12sqm and height of 10m), (viii) gas engine compound (gross area of 246.44sqm) containing 5no. Containerised combined heat and power (chp) gas engines (each 5.55m in height), (ix) electrical substation (gross area of 910.8sqm) containing switchyard, esb substation building (gross area of 110.62sqm and height of 5.96m), ancillary electrical plant and bunded transformer which will electrically connect the development to the existing 110kv derryiron substation located on lands to the south of the development site, (x) an open area compound containing solid oxide fuel electrolysis cell (sofec) enclosures which will convert carbon dioxide, steam and methane into renewable energy, (xi) 2no. Store containers, containerised steam engine and containerised heat recovery plant (each of gross area of 29.77m and height of 2.9m), (xii) syngas and fuel storage tanks (gross area of 295sqm), and (xiii) all ancillary development, including; perimeter landscaped soil berms with tree screening, perimeter fencing with access gate at primary vehicle site entrance which will connect the development to the existing roads of the adjacent rhode business park providing access to the r400, car parking, lighting, internal access roads, weighbridge, carbon filter, process water and firefighting water storage tanks and all civil engineering works for the disposal of foul and surface water
Key dates
Timeline
- Application received5 June 2020
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
DEVELOPMENT OF A COMBINED HEAT AND POWER GENERATING BIOMASS GASIFICATION PLANT WITH INTEGRATED CARBON CAPTURE…
COOLCOR , RHODE , CO OFFALY
20237OffalyLodged 23 Jun 2020Energy
- Granted190 m away
(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on existing concrete slabs, (ii)…
Coolcor , Rhode , County Offaly
2460479OffalyLodged 3 Dec 2024Energy
- Awaiting decision190 m away
(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on an existing concrete slabs,…
Coolcor , Rhode , County Offaly
2460472OffalyLodged 28 Nov 2024Energy
- Awaiting decision210 m away
(i) one new super capacitor container, (ii) two new two-storey modular DC containers, (iii) one new control…
Coolcor , Rhode , County Offaly
2660353OffalyLodged 3 Jul 2026
- Granted230 m away
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020Energy
- Awaiting decision230 m away
PL2/20/238 FOR AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
EX26009OffalyLodged 27 May 2026Energy
- Granted270 m away
DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 20MW OF SYSTEM SUPPORT SERVICES TO THE…
COOLCOR , RHODE , CO. OFFALY
19161OffalyLodged 10 Apr 2019Energy
- Granted280 m away
An Operations Building with a floor area of approximately 285m2. The Operations Building will consist of — 1…
Coolcor , Rhode , Co. Offaly
2560129OffalyLodged 17 Apr 2025Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
DEVELOPMENT OF A COMBINED HEAT AND POWER GENERATING BIOMASS GASIFICATION PLANT WITH INTEGRATED CARBON CAPTURE…
COOLCOR , RHODE , CO OFFALY
20237OffalyLodged 23 Jun 2020
- GrantedEnergy
Construction of a renewable bioenergy plant to generate up to 4MW of electricity from 90,000 tonnes of…
Inchera, Little Island, Co.Cork,
154926corkLodged 6 May 2015
- GrantedEnergy
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020
- GrantedEnergy
DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 20MW OF SYSTEM SUPPORT SERVICES TO THE…
COOLCOR , RHODE , CO. OFFALY
19161OffalyLodged 10 Apr 2019
- Awaiting decisionEnergy
PL2/20/238 FOR AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
EX26009OffalyLodged 27 May 2026
- GrantedEnergy
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as…
Inchera Little Island Co.Cork
25/5034corkLodged 3 Jun 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.