Planning Permission Ireland
Awaiting decisionEnergy

Coolcor, Rhode, County Offaly

Installation of two capacitor containers and one inverter container on existing concrete slabs at an energy site in Coolcor.

2460472 · Offaly County Council · Lodged 28 November 2024

Reference
2460472
Authority
Offaly County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
28 November 2024

Summary

AI-generated

The development will consist of placing two new capacitor containers and one inverter container on existing concrete slabs. Access will be via the L-10093-2 road, with all civil and electrical engineering works to connect to the electricity distribution network via the existing on-site substation.

Energyenergyinfrastructuresubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on an existing concrete slabs, (ii) one new inverter container measuring 5.9m x 2.35m x 2.37m placed on an existing concrete slab, (iii) access to the site is from the l-10093-2 which connects the r400 regional road, (v) all civil engineering and electrical engineering works to provide for connection to the electricity distribution network on site via the existing medium voltage substation within the site.

Key dates

Timeline

  1. Application received28 November 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.