COOLCOR AND CLONIN, RHODE, CO. OFFALY
Extension of duration for a battery energy storage facility and synchronous condenser compound.
EX26009 · Offaly County Council · Lodged 27 May 2026
- Reference
- EX26009
- Authority
- Offaly County Council
- Register status
- In progress
- Type
- EXTENSION OF DURATION
- Received
- 27 May 2026
Summary
AI-generatedAn extension of duration is sought for a 2.7-hectare energy storage facility designed to support the electricity grid. The development comprises a battery energy storage system compound with 16 battery enclosures, a synchronous condenser compound with associated buildings, and an electrical substation to connect to the existing Derryion 110kV substation.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Pl2/20/238 for an energy storage facility designed to provide system support services to the electricity grid on a 2.7-hectare site. The development will comprise: (i) an open area battery energy storage system (bess) compound (area of 3,407 sqm) containing 16 no. Battery enclosures (13.716m long x 2.90m wide x 3.796m high), 16 no. Medium voltage power station (mvps) enclosures (12.192m long x 2.438m wide x 3.396m high), (ii) synchronous condenser compound (area of 4,706sqm) containing synchronous condenser building (30.0m long x 18.0m wide x 12.15m high), controls building (12.486m long 12.192m wide x 4.865m high), associated bunded transformers and electrical plant, (iii) electrical substation (area of 2,325sqm) containing customer building (10.032m long x 7.627m wide x 6.169m high), eirgrid building (13.507m long x 12.509m wide x 7.577m high), and electrical plant and bunded transformer which will electrically connect the development to the exisiting derryion 110kv substation located on lands adjoining the site to the south , (iv) control building (17.075m long x 5.830m wide x 5.960m high), and (v) all ancillary development, including; lighting mast protection, perimeter palisade fencing with access gate at primary vehicle site entrance which will connect to the existing roads of the adjacent rhode business park providing access to the r400, landscaping, lighting,car parking, internal access roads and all civil engineering works for the disposal of foul and surface water. A natura impact statement (nis) has been prepared and accompanies this planning application
Key dates
Timeline
- Application received27 May 2026
- Decision due21 July 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020Energy
- Granted70 m away
DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 20MW OF SYSTEM SUPPORT SERVICES TO THE…
COOLCOR , RHODE , CO. OFFALY
19161OffalyLodged 10 Apr 2019Energy
- Awaiting decision110 m away
(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on an existing concrete slabs,…
Coolcor , Rhode , County Offaly
2460472OffalyLodged 28 Nov 2024Energy
- Granted110 m away
(i) two new capacitor containers each measuring 13.7m x 2.7m x 2.9m placed on existing concrete slabs, (ii)…
Coolcor , Rhode , County Offaly
2460479OffalyLodged 3 Dec 2024Energy
- Granted180 m away
EIRGRID PLC (WITH THE CONSENT AND APPROVAL OF THE ELECTRICITY SUPPLY BOARD (ESB)), INTENDS TO APPLY FOR…
DERRYIRON 110KV SUBSTATION , CLONIN RHODE , CO. OFFALY
22664OffalyLodged 21 Dec 2022Infrastructure
- Granted180 m away
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation…
Clonin , Rhode , Co. Offaly
2560345OffalyLodged 31 Jul 2025Energy
- Awaiting decision180 m away
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation…
Clonin , Rhode , Co. Offaly
2560299OffalyLodged 10 Jul 2025Energy
- Awaiting decision190 m away
(i) one new super capacitor container, (ii) two new two-storey modular DC containers, (iii) one new control…
Coolcor , Rhode , County Offaly
2660353OffalyLodged 3 Jul 2026
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020
- GrantedEnergy
DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 20MW OF SYSTEM SUPPORT SERVICES TO THE…
COOLCOR , RHODE , CO. OFFALY
19161OffalyLodged 10 Apr 2019
- GrantedEnergy
DEVELOPMENT OF A COMBINED HEAT AND POWER GENERATING BIOMASS GASIFICATION PLANT WITH INTEGRATED CARBON CAPTURE…
COOLCOR , RHODE , CO OFFALY
20237OffalyLodged 23 Jun 2020
- GrantedEnergy
DEVELOPMENT OF AN ENERGY STORAGE SYSTEM (ESS) FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE…
CLONIFFEEN , SHANNONBRIDGE , CO. OFFALY
21295OffalyLodged 11 May 2021
- GrantedEnergy
THE DEVELOPMENT WILL CONSIST OF A GRID STABILISATION FACILITY COMPRISING OF: THE CONSTRUCTION UP TO 4 NO.…
KILPADDOGE , TARBERT , CO KERRY
19115KerryLodged 12 Feb 2019
- GrantedEnergy
(A) A HIGH INTERTIA SYNCHRONOUS COMPENSATOR (HISC) COMPOUND CONTAINING 1 NO. HISC UNIT ENCLOSED WITHIN A…
KILPADDOGE , TARBERT , CO KERRY
21549KerryLodged 25 May 2021
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.