Awaiting decisionEnergyDecision was due 21 July 2026

COOLCOR AND CLONIN, RHODE, CO. OFFALY

Extension of duration for a battery energy storage facility and synchronous condenser compound.

EX26009 · Offaly County Council · Lodged 27 May 2026

Reference
EX26009
Authority
Offaly County Council
Register status
In progress
Type
EXTENSION OF DURATION
Received
27 May 2026

Summary

AI-generated

An extension of duration is sought for a 2.7-hectare energy storage facility designed to support the electricity grid. The development comprises a battery energy storage system compound with 16 battery enclosures, a synchronous condenser compound with associated buildings, and an electrical substation to connect to the existing Derryion 110kV substation.

Energybattery storagegrid infrastructuresubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Pl2/20/238 for an energy storage facility designed to provide system support services to the electricity grid on a 2.7-hectare site. The development will comprise: (i) an open area battery energy storage system (bess) compound (area of 3,407 sqm) containing 16 no. Battery enclosures (13.716m long x 2.90m wide x 3.796m high), 16 no. Medium voltage power station (mvps) enclosures (12.192m long x 2.438m wide x 3.396m high), (ii) synchronous condenser compound (area of 4,706sqm) containing synchronous condenser building (30.0m long x 18.0m wide x 12.15m high), controls building (12.486m long 12.192m wide x 4.865m high), associated bunded transformers and electrical plant, (iii) electrical substation (area of 2,325sqm) containing customer building (10.032m long x 7.627m wide x 6.169m high), eirgrid building (13.507m long x 12.509m wide x 7.577m high), and electrical plant and bunded transformer which will electrically connect the development to the exisiting derryion 110kv substation located on lands adjoining the site to the south , (iv) control building (17.075m long x 5.830m wide x 5.960m high), and (v) all ancillary development, including; lighting mast protection, perimeter palisade fencing with access gate at primary vehicle site entrance which will connect to the existing roads of the adjacent rhode business park providing access to the r400, landscaping, lighting,car parking, internal access roads and all civil engineering works for the disposal of foul and surface water. A natura impact statement (nis) has been prepared and accompanies this planning application

Key dates

Timeline

  1. Application received27 May 2026
  2. Decision due21 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.