C. 5.14 HA SITE WITHIN THE MOUNT LUCAS WIND FARM, IN THE TOWNLAND OF DRUMCAW OR MOUNTLUCAS, CO.OFFALY

A 2MW pilot-scale hydrogen electrolysis plant is proposed within the Mount Lucas Wind Farm.

22353 · Offaly County Council · Lodged 15 July 2022

Reference
22353
Authority
Offaly County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
15 July 2022

Summary

AI-generated

The development will feature an electrolyser in a container, high-pressure hydrogen storage units, a compression system, and a medium voltage underground cable connection to a nearby wind turbine. Supporting infrastructure includes buffer tanks, borehole wells, HGV trailer bays, and security fencing.

Energyhydrogenrenewablewind farm
Floor area
24 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A 2mw pilot scale hydrogen electrolysis plant which comprises; an electrolyser contained within a standard iso container (c. 12.2m in length, c. 2.4m in width and c. 3.3m in height), 3 no. High pressure hydrogen storage units, 1 no hydrogen compression system, 1 no generator, 2 no substation / transformer structures and a medium voltage underground cable connection to the nearest wind turbine c. 600m to the west. The hydrogen electrolysis plant will be supported by the following infrastructure; hydrogen analyser container, firewall (maximum height 3.6m), underground fibre optic cabling, 2 no. 10 cubic metre buffer tanks, gas control cabinet, power supply unit, 23 cubic metre precast underground water storage tank, water filtration system, 2 no borehole wells, and 4 no. Hgv trailer bays. Ancillary infrastructure will include 1 no welfare portacabin (c. 24sqm) and 4 no. Car spaces, palisade security fencing, vehicular and pedestrian access, a replacement footpath between the site entrance and the main entrance to the wind farm, site drainage works including petrol interceptor and all associated infrastructure and site development works. The application is accompanied by a natura impact statement (nis)

Key dates

Timeline

  1. Application received15 July 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.