DERRYIRON 110KV SUBSTATION, CLONIN RHODE, CO. OFFALY
Upgrades and extension to the Derryiron 110kV substation in Rhode.
22664 · Offaly County Council · Lodged 21 December 2022
- Reference
- 22664
- Authority
- Offaly County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 21 December 2022
Summary
AI-generatedEirGrid PLC intends to upgrade the existing Derryiron 110kV substation on a 1-hectare site in Rhode, Co. Offaly. The works include installing additional electrical apparatus, extending the control building by 73 sqm, and extending the hardstand compound.
- Floor area
- 73 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Eirgrid plc (with the consent and approval of the electricity supply board (esb)), intends to apply for permission for development at site of approximately 1 hectare at derryiron 110kv substation, clonin, rhode, co. Offaly. Development consisting of works to upgrade the existing substation including: the installation of additional air insulated switchgear electrical apparatus (approximately 7m in height) to facilitate the provision of a 110kv busbar; installation of 3 no. Additional bays (each consisting of busbar disconnects, sectionalisers, circuit breakers, current transformers, voltage transformers, line traps, coupling capacitors and other electrical apparatus); an extension to the north of the existing control building (approximately 73 square meters) to provide accommodation for cabinets, other electrical apparatus and a battery room; installation of 2 no. Circuit bypass arrangements (approximately 14m and approximately 4m in height, respectively) to facilitate normal operation of the substation during construction; and an extension to the hardstand compound (approximately 0.03 hectares). The development will also consist of: all ancillary and associated electrical works to facilitate the proposed development; and all other associated site excavation, infrastructural and site development works above and below ground, including site preparation works, site clearance and levelling; hardstanding, internal access tracks and temporary construction compound; earthgrid, surface water drainage network; palisade fencing (approximately 2.7m high) and gates; and landscaping.
Key dates
Timeline
- Application received21 December 2022
- Decision due23 February 2023
- Decision issued23 February 2023
- Grant issued30 March 2023
- Permission expiry29 March 2028
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation…
Clonin , Rhode , Co. Offaly
2560345OffalyLodged 31 Jul 2025Energy
- Awaiting decisionAt this site
A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation…
Clonin , Rhode , Co. Offaly
2560299OffalyLodged 10 Jul 2025Energy
- Granted120 m away
A ten-year permission for construction of a new site entrance and access track to serve the already consented…
Clonin Rhode , Co. Offaly , Ireland
2460067OffalyLodged 7 Mar 2024Infrastructure
- Awaiting decision120 m away
A TEN- YEAR LIFECYCLE FOR CONSTRUCTION OF A NEW SITE ENTRANCE AND ACCESS TRACK TO SERVE THE ALREADY CONSENTED…
CLONIN , CO. OFFALY
23413OffalyLodged 8 Nov 2023Infrastructure
- Awaiting decision120 m away
A ten-year permission for construction of a new site entrance and access track to serve the already consented…
Clonin , Co. Offaly , Ireland
2460044OffalyLodged 16 Feb 2024Infrastructure
- Granted130 m away
DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 20MW OF SYSTEM SUPPORT SERVICES TO THE…
COOLCOR , RHODE , CO. OFFALY
19161OffalyLodged 10 Apr 2019Energy
- Granted170 m away
THE REMOVAL OF THE EXISTING PREFABRICATED BUILDINGS. CONSTRUCTION OF A NEW SINGLE STOREY ADMINISTRATION…
RHODE GENERATION STATION , COOLCOR , RHODE
1669OffalyLodged 15 Mar 2016Commercial
- Granted180 m away
AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID ON A…
COOLCOR AND CLONIN , RHODE , CO. OFFALY
20238OffalyLodged 23 Jun 2020Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedInfrastructure
DECOMMISSIONING AND REMOVAL OF ELECTRICAL PLANT AND ASSOCIATED STRUCTURES AND THE DEMOLITION OF THE EXISTING…
BELLACORICK , BALLINA , CO. MAYO
18274MayoLodged 23 Apr 2018
- Awaiting decisionInfrastructure
(WITH CONSENT & APPROVAL OF THE ELECTRICITY SUPPLY BOARD (ESB)) IS APPLYING TO OFFALY CO.CO & LAOIS CO.CO FOR…
THE TOWNLANDS OF BISHOPSWOOD TINACRANNAGH , CO. OFFALY
22656OffalyLodged 20 Dec 2022
- GrantedEnergy
THE DEVELOPMENT WILL CONSIST OF A GRID STABILISATION FACILITY COMPRISING OF: THE CONSTRUCTION UP TO 4 NO.…
KILPADDOGE , TARBERT , CO KERRY
19115KerryLodged 12 Feb 2019
- GrantedInfrastructure
CONSTRUCTION OF A NEW 110KV CONTROL BUILDING AT THE EXISTING SUBSTATION AND ALL ASSOCIATED ELECTRICAL AND…
11038KV SUBSTATION , TRIENERAGH , LISTOWEL
21624KerryLodged 8 Jun 2021
- GrantedInfrastructure
The development will consist of — Installation of outdoor Air Insulated Switchgear (AIS) electrical…
Woodland , Batterstown , Co. Meath
221550MeathLodged 30 Nov 2022
- Awaiting decisionInfrastructure
Development on a c. 0.2 ha site, on ESB lands. The development will consist of a physical extension of c. 701…
Lands at the existing Buttevant 38kV Station, Spital Townland, Buttevant, Co. Cork
205187corkLodged 11 Jun 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.