Planning Permission Ireland
Awaiting decisionInfrastructure

Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly

Construction of a 38kV grid connection cable near Clara.

2660105 · Offaly County Council · Lodged 4 March 2026

Reference
2660105
Authority
Offaly County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
4 March 2026

Summary

AI-generated

The development consists of a 38kV hybrid grid connection cable to connect the permitted Ballyboughlin Solar Park to the Clara Substation. It includes laying 4.5km of underground cable and constructing 0.898km of overhead cable.

Infrastructuresolargrid connectioninfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Red iii - for development at this site in the townlands of lehinch, kilcoursey, kilbride, aghamore, raheen and clara, near clara, co. Offaly. The development will consist of a 38kv hybrid grid connection cable and is intended to connect the permitted ballyboughlin solar park (pl. Ref. 24/60338) to the existing clara 38kv substation. The proposed development will consist of: the laying of a 38kv underground electrical grid connection cable (c. 4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing clara 38kv substation to the permitted ballyboughlin solar park (pl. Ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. Joint bays and 38kv underground ducting and cabling. A natura impact statement (nis) accompanies this planning application. The nis assesses both the construction and operation of the proposed development, as well as integral elements of the wider project infrastructure, comprising the permitted ballyboughlin solar park (pl. Ref. 24/60338) which consists of the construction and operation of c. 14mw solar photovoltaic (pv) farm located off curragh road (l20171) in the townland of clara, near clara, co. Offaly and all associated works. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Church Road, Clara, Co OffalyMar 2025€105,000310 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 March 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.