Planning Permission Ireland
Awaiting decisionEnergyDecision due in 11 days (3 August 2026)

townlands of Chamberstown Scottstown Shalvanstown, Mullagha Rathcoon, and Corballis County Meath

Construction of a major solar farm spanning up to 559,033 square metres across several townlands in County Meath.

2561010 · Meath County Council · Lodged 24 September 2025

Reference
2561010
Authority
Meath County Council
Register status
In progress
Type
PERMISSION
Received
24 September 2025

Summary

AI-generated

The RED III development comprises ground-mounted solar PV arrays, 21 electrical inverter/transformer units, and a single-storey substation control building. The application seeks a 10-year planning permission and a 40-year operational life.

Energysolarrenewableinfrastructure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Red iii - the proposed development comprises the following –
  • Construction and operation of up to 559,033 sqm of solar pv arrays on ground-mounted metal frames, with a maximum overall height of up to 2.96 metres
  • Internal underground trenching, electrical cabling and ducting between the solar pv arrays and electrical invertor / transformer skid units
  • Up to 21 no. Electrical inverter / transformer skid units
  • Construction and operational access to the site by 3 no. Site entrances using 2 no. Existing field access points 1 no. New access point
  • 3 no. Temporary construction compound and ancillary facilities for the duration of the construction phase of the project
  • Provision of single storey substation control building of 217 sqm and associated works
  • 33kv collector cable network, joint bays and associated works
  • Internal access tracks, site landscaping and drainage works, security fencing, cctv and all associated ancillary site development works
  • The decommissioning and reinstatement of the solar farm at the end of its operational life. A 10-year planning permission and a 40-year operational life from the date of commissioning of the entire solar farm is being sought. A natura impact statement (nis) has been prepared and accompanies the planning application. The nis assesses both the construction and operation of the proposed development, as well as integral elements of the wider project infrastructure, comprising the construction and operation of a 110kv substation compound, control building, 110kv transformer, 110kv cabling, joint bays, future grid connection and associated works (located in the townlands of rathcoon, kilberry, castletown kilberry, and silloge), all of which are essential infrastructure associated with the operation of the proposed development and will be the subject of a separate, future sid planning application to the relevant consenting authority. The development is covered by the provisions of the renewable energy directive iii (directive 2023/2413) [x] yes [ ] no. The planning application is subject to section 34d of the planning and development act, 2000, as amended

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received24 September 2025
  2. Further information requested19 December 2025
  3. Further information received9 June 2026
  4. Decision due3 August 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.