Development plan · Clare County Council
Clare County Development Plan 2023–2029 (as varied)
The council's development plan written statement: its strategy, policies, objectives and development standards.
Ask this document
Answers come only from the text of Clare County Development Plan 2023–2029 (as varied), each claim linked to its page. They are not advice; check the page itself.
- 33 Road running west from Bealaha Bridge as far as its junction with the N67 34 R487 from the junction with the R488 south to T-junction at Killeenagh 35 Road from Feeard past the Bridges of Ross to the R487517
- Appendix 6 Public Rights of Way and Recreational Routes Public Rights of Way Public rights of way which give access to seashore, mountain, lakeshore, riverbank or other places of natural beauty or recreational utility: • Turret Lane, Kilrush – connecting Grace Street and Vandeleur Demesne • The Rocky Road, Ennis (part of) The inclusion of a public right of way in this plan is based on evidence of such a right of way existing and in particular of its compliance with the specific requirements of Section 10(2)(o) of the Planning and Development Act 2000, as amended. It does not affect the existence of validity of any other public right of way which are not included in this plan. Public Rights of Way are identified overleaf on Map 6.1A and 6.1B. Recreational Routes County Clare has a wealth of recreational routes both in urban and rural areas which explore some of the county’s outstanding natural beauty and heritage. These routes include the following and are identified overleaf on Map 6.2. • EuroVelo Route – Cycling • Doolin Cycle Hub Loop 1,2,3,4 – Cycling • Cliffs of Moher Coastal Walk - Link to National Waymarked Way • Carran Loop - National Loop Walk • Caher Valley Loop - National Loop Walk • O'Briensbridge - Old Barge loop, Parteen Weir, Errinagh Bridge - National Loop Walk • Ruan - Dromore Wood Loop - National Loop Walk • Ballyvaughan Wood Loop - National Loop Walk • Tullaher Loop - National Loop Walk • Ballinruan Loops - National Loop Walk • Ballyvaughan - Black Head loop - National Loop Walk • Templecronan Loop - National Loop Walk • Doonbeg Loop - National Loop Walk • Lough Avalla Farm Loop - National Loop Walk • Ballinruan Loops - National Loop Walk • Gortnamearacaun Loop - National Loop Walk • Mid Clare Way - National Waymarked Trail • Burren Way - National Waymarked Trail • East Clare Way - National Waymarked Trail • 12 O’Clock Hills Looped Walks – Blue, Red, Purple Route - Other • Fanore Ballyvaughan Trek - Other • Vandeleur Garden Walkway - Other • Lough Derg Walk - Other • Loop Headland and Lighthouse - Other518
No text on this page — it is probably a drawing, a map, a photograph or a scanned page. See it in the PDF.
No text on this page — it is probably a drawing, a map, a photograph or a scanned page. See it in the PDF.
- Appendix 7 Plans, Policies and Guidelines to which the Development Plan must have regard Under Section 28 of the Planning and Development Act 2000, as amended, the Planning Authority is required to append a statement to the development plan including information which demonstrates how the Planning Authority has implemented the policies and objectives of the Minister, as contained in the Guidelines, when considering their application to the area or part of the area of the development plan. Alternatively, if the Council has formed the opinion that it is not possible, because of the nature of characteristics of the area of the development plan, to implement certain policies or objectives contained in the Minister’s guidelines, the statement shall give reasons for the forming of the opinion and why the policies and objectives of the Minister have not been implemented. The required statement in relation to the Clare County Development Plan 2023-2029 is set out below. The Clare County Development Plan 2023-2029 is referred to hereunder as ‘the plan’. Section 28 Guidelines Clare County Development Plan 2023 - 2029 Guidelines for Local Authorities and An Bord Pleanála on Carrying Out Environmental Impact Assessments (DHPLG, 2018) The purpose of the Guidelines is to provide practical guidance to Planning Authorities and An Bord Pleanála (ABP) on legal and procedural issues arising from the requirement to carry out an EIA in relevant cases. The guidelines relate essentially to the responsibilities on the Planning Authority and ABP as contained in the current Section 172 of the Planning and Development Act 2000, as amended. They are not relevant to the plan preparation process. Government Policy on Architecture 2009- 2015, DEHLG This document has informed Chapters 16, 17 and 18 as well as Appendix A1. Appropriate Assessment of Plans and Projects in Ireland – Guidance for Planning Authorities, 2009. The preparation of the plan has had regard to this guidance document. A Natura Impact Report was prepared and accompanies the plan. Strategic Environmental Assessment: Guidelines for Regional Assemblies and Planning Authorities, 2022, and Strategic Environmental Assessment (SEA) Guidelines, 2004. The preparation of the plan has had regard to these guidelines. Strategic Environmental Assessment was initiated with the preparation of an SEA Environmental Report accompanying this plan.521
- Section 28 Guidelines Clare County Development Plan 2023 - 2029 Architectural Heritage Protection – Guidelines for Planning Authorities, 2004 (as updated 2011). Chapter 16 Architectural, Archaeological and Culture Heritage has been prepared in accordance with the guidelines. Implementing Regional Planning Guidelines – Best Practice Guidance, 2010. Chapter 3 Core Strategy, Chapter 4 Urban and Rural Spatial Strategy and Chapter 5 Housing set out the policy objectives to ensure that the Core Strategy requirements of the plan are consistent with national and regional policy (National Planning Framework and the Regional Spatial and Economic Strategy for the Southern Region) as required by the 2010 guidance document (which refers to the former national and regional strategy). Childcare Facilities - Guidelines for Planning Authorities, 2001 (as updated by Circular letter PL3/2016). Chapter 10 Sustainable Communities and Appendix 1 Development Management Guidelines have addressed the provision of community facilities across the county in accordance with the guidelines and Circular PL3/2016. Development Management Guidelines, 2007. Appendix 1 Development Management Guidelines has been prepared having considered these guidelines. Development Plan – Guidelines for Planning Authorities, 2007 & 2022. The Development Plan Guidelines for Planning Authorities 2007 and updated guidelines 2022 have informed the preparation of this development plan. Guidance Note on Core Strategies, 2010. Chapter 3 Core Strategy has been carried out in accordance with these guidelines. Quarries and Ancillary Activities, 2004. The role and impact of quarries has been considered and incorporated into Chapter 8 Rural Development and Natural Resources of the development plan in accordance with these guidelines. Provision of Schools and the Planning System, 2008. Chapter 10 Sustainable Communities and Appendix 1 Development Management Guidelines have been prepared having regard to these guidelines.522
- Section 28 Guidelines Clare County Development Plan 2023 - 2029 Retail Planning Guidelines, 2012. Chapter 6 Economic Development and Chapter 7 Retail refers to the guidelines and contains the policies and objectives pertaining to retail. Sustainable Rural Housing Guidelines, 2005. Chapter 4 Urban and Rural Spatial Strategy, Chapter 5 Housing, Chapter 8 Rural Development and Natural Resources, Chapter 10 Sustainable Communities and Chapter 14 Landscape set out the rural housing policies and objectives for the county. These policies and objectives incorporate the recommendations of the guidelines. Sustainable Residential Development in Urban Areas, 2009. These guidelines have been considered in the context of Chapter 17 Towns and Villages, Chapter 18 Design and Placemaking and Appendix 1 Development Management Guidelines to encourage the provision of high quality design and density in the settlement areas of the county in accordance with the guidelines. The Planning System and Flood Risk Management – Guidelines for Planning Authorities, 2009. A Strategic Flood Risk Assessment (SFRA) has been carried out for the county having regard to the guidelines. The SFRA document accompanies the plan and identifies areas at risk of flooding. Policies and objectives in relation to flood risk have also been included in the plan. Spatial Planning and National Roads Guidelines, 2012. Chapter 4 Urban and Rural Spatial Strategy, Chapter 11 Physical Infrastructure, Environment and Energy, and Appendix 1 Development Management Guidelines contains specific policies and objectives that alleviates national primary and secondary roads, outside of urban speed limits in accordance with these guidelines. Design Manual for Urban Roads and Streets, 2013 (as updated in 2019). Chapters 17 Towns and Villages, Chapter 18 Design and Placemaking, and Appendix 1 Development Management Guidelines address these guidelines set out provision for practical design measures to encourage more sustainable travel patterns in urban areas and best practice in the design of street networks and individual streets.523
- Section 28 Guidelines Clare County Development Plan 2023 - 2029 Urban Development and Building Heights – Guidelines for Planning Authorities, 2018. Chapters 17 Towns and Villages, Chapter 18 Design and Placemaking, and Appendix 1 Development Management Guidelines cover this item in accordance with the guidelines. Wind Energy Development Guidelines (2006 and draft 2019) Chapter 2 Climate Action, Chapter 11 Physical Infrastructure, Environment and Energy, and Volume 6 Clare Renewable Energy Strategy has been formulated having regard to the Wind Energy Guidelines. Development Contribution Schemes – Guidelines for Planning Authorities, 2013. These guidelines have been considered in the making of the plan. It is recognised that the guidelines assist planning authorities in achieving a balance between the cost of the s services provided and the need to support economic activity and renewal through the development contribution scheme. National Landscape Strategy for Ireland 2015-2025 Chapter 14 Landscape and the Landscape Character Assessment have taken cognisance of the National Landscape Strategy for Ireland 2015-2025 which recognises the importance of landscape protection and its interconnectivity with biodiversity and climate change. Sustainable Urban Housing Design Standards for New Apartments, 2015 (as updated 2018). These guidelines have been considered and complied with. Quality Housing for Sustainable Communities – Design Guidelines, 2007. These guidelines have been considered and complied with throughout the plan-making process. Tree Preservation – Guidelines for Planning Authorities, 2019. These guidelines have been considered and complied with throughout the plan-making process. Telecommunications Antennae and Support Structures – Guidelines for Planning Authorities, 1996. Chapter 11 Physical Infrastructure, Environment and Energy recognises the importance of critical communication infrastructure in accordance with these guidelines. Interim Guidelines for Planning Authorities on Statutory Plans, Renewable Energy and Climate Change, 2017. The plan has been prepared in accordance with these guidelines.524
- Section 28 Guidelines Clare County Development Plan 2023 - 2029 Best Practice Urban Design Manual (May 09) Part 1 & Part 2. This design manual has informed the content of Chapters 17 and 18. Rural Housing Policies and Local Need Criteria in Development Plans – Circular Letter SP/5/08. The settlement strategy outlined in Chapter 4 of the plan is considered to be consistent with the above circular. Specifically, the criteria for determining a person’s economic, social or exceptional need to live in a specific rural area. The above circular also reiterates the requirement in the 2005 Sustainable Rural Housing Guidelines in respect of the promotion and preservation of the Irish language. The plan includes an objective to provide for the linguistic and cultural heritage of the county through support for organisations involved in the continued promotion and preservation of the Irish language and culture. Funfair Guidance, 2003. These guidelines relate to the licensing and requirements for a specific type of land use – funfairs. They are not relevant to the preparation process of the plan. Housing Options for Our Ageing Population: Policy Statement DHPLG and DoH, 2019. Chapters 5, 10, 11, 17, 18 and 19 make reference to these guidelines which support our ageing population in a way that will increase the accommodation options available and give meaningful choice in how and where people choose to live as they age. Housing Supply Target Methodology for Development Planning. DHLGH, 2020. The core strategy of this plan reflects the methodology set out in these guidelines in Chapter 3 Core Strategy and Chapter 5 Housing. Local Area Plans - Guidelines for Planning Authorities (DECLG, 2013) Volume 3 contains the policies and objectives for the settlements within each of the municipal districts covered by the plan, are consistent with Volume 1 of the plan, and reflect the provisions of these guidelines. The plan is also consistent with higher level plans and strategies.525
- Section 28 Guidelines Clare County Development Plan 2023 - 2029 Development Plans, Guidelines for Planning Authorities DHLGH, June 2022. All aspects of the plan is informed by this guidance, in particular the core strategy and the zoning of lands and policy objectives. Part V of the Planning and Development Act 2000 – Guidelines DHPCLG, 2017. Chapter 5 Housing makes reference to these Guidelines and implements the relevant policies and objectives in the development plan. Sustainable Urban Housing, Design Standards for New Apartments: Guidelines for Planning Authorities DHPLG, 2020. Chapter 5 Housing, Chapter 17 Towns and Villages, Chapter 18 Design and Placemaking and Appendix 1 Development Management Guidelines make reference to these guidelines. Universal Design Guidelines for Early Learning and Care Centres 2019. The plan makes reference to and is informed by these guidelines in Chapter 10 Sustainable Communities Frameworks and Principles for the Protection of the Archaeological Heritage (Government of Ireland 1999) The plan is informed by these guidelines in Chapter 16 Architectural, Archaeological and Culture Heritage. Planning Leaflet 13 - Archaeology in the Planning Process (OPR, 2021) The plan is informed by these guidelines in Chapter 16 Architectural, Archaeological and Culture Heritage. OPR Practice Note PN03 Planning Conditions (October 2022). The plan is informed by these guidelines throughout. National Planning Framework Implementation: Housing Growth Requirements (DHLGH July 2025) These guidelines have been considered and complied with. Sustainable Residential Development and Compact Settlements Guidelines for Planning Authorities (DHLGH, 2024) These guidelines have been considered and complied with. The document has informed Appendix A1526
Source Clare County Council: Clare County Development Plan 2023–2029 (as varied) (2023–2029) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.