Development plan · Donegal County Council
County Donegal Development Plan 2024–2030 (As Varied)
The council's development plan written statement: its strategy, policies, objectives and development standards.
Donegal County Council · 2024–2030 · 783 pages
Ask this document
Answers come only from the text of County Donegal Development Plan 2024–2030 (As Varied), each claim linked to its page. They are not advice; check the page itself.
Free, with a daily limit.
- County Donegal Development Plan 2024-2030 (As Varied) 719 Chapter 26 Na Cealla Beaga/Killybegs Area PlanChapter 26 Na Cealla Beaga/Killybegs Area Plan Appendix: Na Cealla Beaga (Killybegs) Area Plan Summary Infrastructural Assessment Matrices Table 26.2: Residential Development Zonings Summary Infrastructural Assessment Matrix The table below contains a summary assessment of the suitability of zoned sites for residential development having regard to the provisions of the National Government’s ‘National Planning Framework’ (Section 10.2 ’Co-ordinating Land Use Zoning, Infrastructure and Services’) and ‘Development Plan Guidelines’ (Section 4.5.2 and Appendix A). Zoning Reference Weighted Site Area(ha)* Housing Yield (Units) Roads Footpath Public Lighting Surface Water Foul Sewer Water Supply Written Analysis Regarding Tier 1 & Tier 2. Within CSO Boundary NR1.1 0.216 5 N Y Y Y Y Y Most Services available. Tier 1. Needs ROW access and connection to private foul sewer NR1.2 0.627 16 N N Y Y Y Y Most Services available. Tier 1. Needs ROW access and connection to private foul sewer NR1.3 1.270 32 Y Y Y Y Y1 Y All Services available. Tier 1. NR1.5 1.506 38 Y y Y Y Y1 Y All Services available. Tier 1. NR1.6 2.005 50 Y N Y Y Y Y All Services available. Tier 1 EXCEPT PUBLIC FOOTPATH. NR1.7 0.98 24 Y N N Y Y Y Most services available. Tier 1. Needs ROW access and connection to watermain and foul sewer. NR1.8 3.29 82 Y N Y N Y2 Y1 Extensions to connect to infrastructure in Roshine Road required. Upsizing of sewer and localized network reinforcement may be required. Access to public road by private rights of ways. Residential Phase 2 Zonings1 NR2.1 0.986 25 Y Y Y N Y1 Y Upgrading of watermain and extension lead to foul sewer required. All other services available. Tier 2 NR2.2 0.417 10 Y Y* Y Y N Y Upgrading of watermain and extension lead to foul sewer required. All other services available. Tier 2 NR2.3 0.823 21 Y Y Y Y Y2 N Watermain and sewer, extension Required. All other services available. Tier 2 NR2.4 1.777 44 Y N Y Y Y1 Y Upgrading of sewer and provision of footpath required. All other services available. Tier 2
- County Donegal Development Plan 2024-2030 (As Varied) 720 Chapter 26 Na Cealla Beaga/Killybegs Area PlanChapter 26 Na Cealla Beaga/Killybegs Area Plan Zoning Reference Weighted Site Area(ha)* Housing Yield (Units) Roads Footpath Public Lighting Surface Water Foul Sewer Water Supply Written Analysis Regarding Tier 1 & Tier 2. Within CSO Boundary NR2.5 1.602 40 Y Y Y Y Y1 Y1 Upgrading of watermain and sewer. All other services available Tier 2 Footnote: This infrastructural analysis includes New Residential Phase 2 which sites have not been identified for immediate residential development as other more optimal sites (in terms of key planning criteria) were selected to deliver the Core Strategy housing target. 1. Depending on scale of development realised local network upgrades and/or extensions may be required. 2. Extensions to existing network will be required.
- County Donegal Development Plan 2024-2030 (As Varied) 721 Chapter 26 Na Cealla Beaga/Killybegs Area PlanChapter 26 Na Cealla Beaga/Killybegs Area Plan Table 26.3: Economic Development Zonings Summary Infrastructural Assessment Matrix The table below contains a summary assessment of the suitability of zoned lands for economic development. Economic Development Land at An Killybegs Infrastructural Assessment Site Code Developed (ha) Undeveloped (ha) Wastewater Water Supply Roads Footpaths Lighting BE1 1.562 6.445 X BE2 28.77 22.02 X BE3 1.708 BE4 0.2093 BE5 1.225 BE6 5.357 BE7 2.116 BE8 1.094 X BE9 3.032 BE10 0.7466 BE11 3.465 X X OppSite2 0.1345 OppSite3 0.2162 Opp Site 4 0.2257 X X X Opp Site 5 0.3157 X X OppSite7 1.517 X X X X Opp site 10 0.1428 TOTAL 49.6356 30.5234
- County Donegal Development Plan 2024-2030 (As Varied) 722 Chapter 26 Na Cealla Beaga/Killybegs Area Plan Map 26.2: Location of Economic Development Zonings Referenced Above
- County Donegal Development Plan 2024-2030 (As Varied) 723
- County Donegal Development Plan 2024-2030 (As Varied) 724 Chapter 21 Settlement FrameworksChapter 27 Settlement Frameworks PART C Chapter 27 – Settlement Frameworks 27.1 Introduction The purpose of this Chapter is to set out spatial planning frameworks and associated land use zoning objectives to guide development within the 53 no. Settlement Frameworks identified in the Settlement Strategy in the Core Strategy, Chapter 3 of this Plan. These frameworks are listed alphabetically within their Municipal Districts (with their associated map numbers) in Table 21.1 below. The Settlement frameworks are designed to be sufficiently detailed and/or geographically specific to successfully manage the overall pattern and type of development in these town and village locations. The Settlement strategy has identified 5 Settlement hierarchies which seek to approach the urban structure in a balanced and proportionate manner. All 53 Settlement frameworks are spread across the Service Towns and Rural Settlement layers of the hierarchy which is set out below: • Regional Growth Driver - Letterkenny • County Growth Drivers – Buncrana, Ballybofey/Stranorlar, Donegal Town, Killybegs, An Clochan Liath. • Service Towns – Lifford, Carndonagh, Ballyshannon, Bundoran, Raphoe, Bunbeg-Derrybeg, Milford. • Rural Settlements – Gaeltacht, Border & WAW Settlements, Satellite towns and Rural settlements with a focus on Regeneration. • Open Countryside . and to achieve the following planning objectives: Create compact urban forms, protect the rural character of adjoining rural areas, and delineate the geographical extent of urban and rural policies of this Plan by setting an outer development envelope/boundary for each settlement. Ensure that new residential development is located in close proximity to local services, infrastructure and amenities and takes place in a sequential manner outwards from the settlement core. Create vibrant, consolidated, and accessible town centres which are the core of retail, commercial, cultural and community life within the settlements. Provide an adequate level of recreational and environmental amenity by protecting existing open/green spaces, reserving sufficient land for amenity purposes and protecting pedestrian linkages. Reserve sufficient land for educational, community and tourism purposes in appropriate locations. Protect specific development opportunities through the designation of opportunity sites. Provide for future road development by protecting infrastructural corridors. To this end the Settlement Frameworks identify settlement envelopes, town centre boundaries, and land for inter alia residential, amenity, opportunity sites, community & education facilities,
- County Donegal Development Plan 2024-2030 (As Varied) 725 Chapter 21 Settlement FrameworksChapter 27 Settlement Frameworks regeneration opportunities and TEN-T Priority Route Improvement Project, Donegal and the latter is in the case of Lifford only. In addition the Settlement Framework also consist of lands that, although not specified as being for a particular use, can be used for a variety of purposes such as community, educational, recreational, health and employment on a case by case basis and will thus help to achieve the abovementioned planning objectives. The Settlement Frameworks are not designed to be exhaustive in the presentation of all the relevant matters that may be considered in the determining of a planning application, as further issues may evolve over time or may be pertinent in certain site-specific cases. Table 27.1 List of Settlement Frameworks. MAP NUMBER SETTLEMENT DONEGAL MD 27.1 AN CHARRAIG (CARRICK) 27.2 BALLINTRA 27.3 BRUCKLESS 27.4 CILL CHARTAIGH (KILCAR) 27.5 DUNKINEELY 27.6 FROSSES 27.7 GLEANN CHOLM CILLE (GLENCOLMCILLE) 27.8 LAGHY 27.9 MOUNTCHARLES 27.10 PETTIGO 27.11 ROSSNOWLAGH GLENTIES MD 27.12 AILT AN CHORRÁIN (BURTONPORT) 27.13 ANAGAIRE (ANNAGRY) 27.14 AN BUN BEG/DOIRÍ BEAGA (BUNBEG- DERRYBEG) 27.15 AN DÚCHORAIDH (DOOCHARY) 27.16 AN FÁL CARRACH (FALCARRAGH) 27.17 ARDARA 27.18 BAILE NA FINNE (FINTOWN) 27.19 CREESLOUGH 27.20 DUNFANAGHY
- County Donegal Development Plan 2024-2030 (As Varied) 726 Chapter 21 Settlement FrameworksChapter 27 Settlement Frameworks 27.21 GLENTIES 27.22 GORT AN CHOIRCE (GORTAHORK) 27.23 LOCH AN IÚIR (LOUGHANURE) 27.24 PORTNABLAGH INISHOWEN MD 27.25 BALLYLIFFEN 27.26 BURNFOOT 27.27 CARRIGANS 27.28 CLONMANY 27.29 CULDAFF 27.30 FAHAN 21.31 GLENEELY 27.32 GREENCASTLE 27.33 KILLEA 27.34 MALIN 27.35 MANORCUNNINGHAM (Errata Letterkenny/Milford MD) 27.36 MOVILLE 27.37 MUFF 27.38 NEWTOWNCUNNINGHAM 27.39 QUIGLEYS POINT LETTERKENNY /MILFORD MD. 27.40 CARRAIG AIRT (Carrigart) 27.41 KERRYKEEL 27.42 KILMACRENAN 27.43 MILFORD 27.44 NA DÚNAIBH 27.45 PORTSALON 27.46 RAMELTON 27.47 RATHMULLAN LIFFORD/STRANORLAR MD. 27.48 CASTLEFIN 27.49 CONVOY
- County Donegal Development Plan 2024-2030 (As Varied) 727 Chapter 21 Settlement FrameworksChapter 27 Settlement Frameworks 27.50 DRUMKEEN 27.51 KILLYGORDON 27.52 LIFFORD 27.53 RAPHOE 27.54 ST JOHNSON Land Use Zoning Objectives. The zoning objectives set out in Table 27.2 below relate to land within the Settlement Framework boundaries and should be read in conjunction with the wider policies contained in Part A of this Development Plan. On zoned lands within the Settlement Frameworks, applications may be granted where the Planning Authority considers that the proposed use or development would comply with the zoning objective of the area and would otherwise comply with the policies of the Plan and would be in accordance with the proper planning and sustainable development of the area. Table 27.2: Land Use Zoning Objectives relating to Settlement Frameworks. LAND USE ZONE OBJECTIVE Amenity To reserve and enhance land for formal and informal amenity and open space purposes, and to make provision for new recreation, leisure and community facilities Opportunity Sites To provide for specific development opportunities that are appropriate in terms of mix of use and compatibility with the wider area whilst recognising features of importance that are specific to the site Town Centre To sustain and strengthen the core of towns as the centres for commercial, retail, cultural and community life. Community & Education (Applies to Milford only). To reserve land for community and institutional, cultural, recreational, healthcare, and amenity purposes. TEN-T PRIPD/Amenity (Applies to Lifford only). To reserve and enhance land for formal and informal amenity and open space purposes, to make provision for new recreation, leisure and community facilities and to provide for the development of the TEN-T Priority Route Improvement Project, Donegal. Land Use Zoning Policy Relating to Settlement Frameworks. Policy LIFF- OPP-1: It is a policy of the Council to only consider ‘water compatible’ development within Flood Zone A on the Opportunity Site at The Common, Lifford. SF-P-1 CC Within flood risk areas identified within settlement frameworks, only the following developments will be considered: Areas of established development, including those parts of the Ballintra, Kilcar, New (currently undeveloped) areas.
- County Donegal Development Plan 2024-2030 (As Varied) 728 Chapter 21 Settlement FrameworksChapter 27 Settlement Frameworks Pettigo, Burtonport, Dunfanaghy and Glenties, and Rathmullan Regeneration Opportunities, Minor development only (e.g. small extensions to houses, and most changes of use of existing buildings and or extensions and additions to existing commercial and industrial enterprises, unless they obstruct important flow paths, introduce a significant additional number of people into flood risk areas or entail the storage of hazardous substance); and Such applications shall be accompanied by a commensurate assessment of the risks of flooding to demonstrate that they would not have adverse impacts or impede access to a watercourse, floodplain or flood protection and management facilities. Such proposals shall follow best practice in the management of health and safety for users and residents of the proposal. Water compatible uses only as per Section 5.28 of the ‘ Planning System and Flood Risk Guidelines’ (DEHLG and OPW, Nov. 2009). Flood risk areas may be viewed at the following link: Settlement Frameworks with High-End Future Flooding Scenario Analysis (arcgis.com) SF-P-2 To guide development of all settlement frameworks including Lifford, Raphoe, Bunbeg-Derrybeg and Milford in a sequential manner, outwards from the core area in order to maximise the utility of existing and future infrastructure provision, promote the achievement of sustainability, avoid leap-frogging’ to more edge-of-centre and edge-of-town areas and to make better use of under-utilised land. This policy shall not apply to small scale business enterprises (excluding retail development) of circa 1 to 5 employees. SF-P-3 To facilitate the sustainable provision of a hotel and marina leisure tourism development at Fahan Marina and its environs. In general, standalone holiday homes will not be supported. (This policy is the subject of Draft Ministerial Direction - for more information refer to www.donegaldevplan.ie or consult.donegal.ie. ) RAM-P-1 Ensure that any development occurring within the area referenced R1 in the settlement framework map for Ramelton: a. Preserves the special character and sense of place of the host Ramelton Architectural Conservation Area. b. Provides vehicular/footpath access solely via the R249 to the north and a separate additional active travel only linkage along the ‘Green Lane’ to the south as far as the existing footpath in Ramelton village. c. Does not materially harm/affect the character of RPS 4080014, provides for the sensitive heritage led regeneration of said structure, preserves the visual setting of said structure and provides a substantial setback and appropriate screening between it and any new development.
Source Donegal County Council: County Donegal Development Plan 2024–2030 (As Varied) (2024–2030) · Licence the publisher's termsText read from the publisher’s PDF; tables, maps and drawings do not survive as text, and page numbers are the PDF’s (its first page is 1). Check the original before relying on a passage.